Work the live Dropbox side-comment lane as a triage surface: who is blocking, which claims are heating up, and which threads are already escalation material.
Dealer blocked
0
Claims waiting on photos, docs, or dealer replies.
OEM blocked
0
Claims sitting behind OEM follow-up, denials, or silence.
Processor blocked
0
Dealer responded, but processor-side next move is still open.
Ready to close
0
Commercially done claims that should get cleared out.
Operator triage

Start with blocker ownership.

Focused thread
Waiting on dealer
0
Claims where the latest thread still points back to missing dealer docs, pictures, or replies.
Waiting on OEM
0
Claims sitting behind OEM authorization, denial resolution, or unanswered factory follow-up.
Waiting on processor
0
Claims where the dealer responded but processor-side next action is still outstanding.
Ready to close
0
Claims that already look commercially done and should be cleared off the board.
Dealer scorecard

Rank comments by dealer performance.

Open scorecard

Communications intelligence

Evidence threads

Repair orders, OEM replies, Dropbox side comments, and the paper trail that unlocks recovery.

Focused evidence thread

Thread evidence for 40598 • LIN 1025.
Stephanie Kendziorski
processor • Jun 19, 2026, 11:01 AM
Submitted PREAUTH124859
/home/openclaw/nas/Dropbox/LIN 1025/1- Pre-Authorizations Needed- iCS/Keystone/40598/40598.pdf
Stephanie Kendziorski
processor • Jun 19, 2026, 11:47 AM
This was uploaded to the #6 folder, can be submitted for payment once approved.
/home/openclaw/nas/Dropbox/LIN 1025/2-Pre-Authorizations Pending-iCS/Keystone/40598/40598.pdf
Alix Mongiat
processor • Jun 22, 2026, 3:32 PM
@cody e @Jeremy G **PLEASE LET ME KNOW IF I CAN SUBMIT WITH THESE APPROVALS Job A: approved for 1 hour Job B: denied - included on job A time Job C: denied - included on Job A time Job D: approved for 0.4 hour Job E: approved for 2 hours (requested 7.5 hours) **If you want us to go back for more time on this, we need further notes as to why this took so long. Job F: approved or 0.2 hour Job G: approved for 0.2 hour
/home/openclaw/nas/Dropbox/LIN 1025/2-Pre-Authorizations Pending-iCS/Keystone/40598/40598.pdf
cody eagle
dealer or external • Jun 22, 2026, 3:56 PM
@Alix M @Jeremy G line e took that long because we had to drop underbelly and test wires from the front to the back and trace wires that requires time
/home/openclaw/nas/Dropbox/LIN 1025/2-Pre-Authorizations Pending-iCS/Keystone/40598/40598.pdf
Alix Mongiat
processor • Jun 22, 2026, 4:24 PM
I will go back to them with this information. Thanks.
/home/openclaw/nas/Dropbox/LIN 1025/2-Pre-Authorizations Pending-iCS/Keystone/40598/40598.pdf
Alix Mongiat
processor • Jun 23, 2026, 3:45 PM
@cody e @Jeremy G Job E has now been approved for 4.5 hours (requested 7.5 hours) @Heidi H @Chris B Please review job E and let me know if we have room to go back for more. They initially approved only 2 hours, I went back and they have now approved for 4.5 hours.
/home/openclaw/nas/Dropbox/LIN 1025/2-Pre-Authorizations Pending-iCS/Keystone/40598/40598.pdf
Alix Mongiat
processor • Jun 24, 2026, 12:15 PM
@JASON S Can you upload the invoices for Jobs E and G? Thanks!
/home/openclaw/nas/Dropbox/LIN 1025/2-Pre-Authorizations Pending-iCS/Keystone/40598/40598.pdf
Jeremy Galvin
dealer or external • Jun 24, 2026, 1:28 PM
@Alix M @cody e this has been closed and moved to ready to submit
/home/openclaw/nas/Dropbox/LIN 1025/2-Pre-Authorizations Pending-iCS/Keystone/40598/40598.pdf
Alix Mongiat
processor • Jun 24, 2026, 3:02 PM
CLAIM123630 has been submitted for payment.
/home/openclaw/nas/Dropbox/LIN 1025/2-Pre-Authorizations Pending-iCS/Keystone/40598/40598.pdf
Processed summary
40598
LIN 1025 • Alix • keystone
Heat 11 • comments 9 • follow-ups 0 • blocker Unknown blocker
Last author processor • Alix Mongiat
CLAIM123630 has been submitted for payment.

Dealer comment scorecard

Overall score blends closeout, dealer response, OEM friction, processor follow-up, escalation, comment quality, tone/compliance, and queue mismatch. Higher is better; risk pressure shows where cleanup work concentrates.
Waiting on dealer
0
Claims where the latest thread still points back to missing dealer docs, pictures, or replies.
Waiting on OEM
0
Claims sitting behind OEM authorization, denial resolution, or unanswered factory follow-up.
Waiting on processor
0
Claims where the dealer responded but processor-side next action is still outstanding.
Ready to close
0
Claims that already look commercially done and should be cleared off the board.

Hottest active conversations

No active comment heat loaded

Escalation risk

No escalation-risk claims loaded

Waiting on dealer

No dealer-blocked claims
No active claim lane is surfacing here right now.

Waiting on OEM

No OEM-blocked claims
No active claim lane is surfacing here right now.

Waiting on processor

No processor-blocked claims
No active claim lane is surfacing here right now.

Ready to close

No ready-to-close claims
No active claim lane is surfacing here right now.
Comment blocker ownership by processor
Processor-level blocker mix from the comment lane.
No blocker pressure loaded
No active processor blocker rows are available right now.
🏠War Room📄Claims⚠️Mfg📚Evidence🗂️Comms⚙️Ops