iClaims logo
Internal operations platform

Claim Detail

Search result → immediate full claim view.
Home
Claim explorer / evidence thread
Claim 79994
BARV600 • Ashlee • Paid • forest-river
Next Recommended Action

Escalate to State

Payment deadline violated
Reason
OEM Response Deadline Exceeded
Deadline
Payment deadline violated
Estimated recovery
Pending payment match
risk 0.00 deadline Overdue / escalation ready images 0 matched 6 review 3

Warranty deadline timeline

Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
152d elapsed • 0d remaining
Analyzed
Completed stage
152d elapsed • 0d remaining
Awaiting OEM
Completed stage
152d elapsed • 0d remaining
Auto-Approved
Completed stage
152d elapsed • 0d remaining
Payment Due
Completed stage
152d elapsed • 0d remaining
Escalation Eligible
Completed stage
152d elapsed • 0d remaining
Resolved
Overdue / escalation ready
152d elapsed • 0d remaining • Overdue

AI Claim Analysis

Estimated Recovery Amount
Pending payment match
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
3
No active evidence gaps are listed.
Deadline Status
Overdue / escalation ready
152 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.

Dossier completeness

Dossier has not been generated yet. Evidence presence is not treated as complete.

US dispute readiness

Evidence packet check

Condensed packet watch
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
28
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Condensed packet watch
Close to a bulky packet. Trim, paginate, and preflight before escalation.
Chronology
Ready to order
Visible span: Jun 1, 2026, 3:48 PM to Oct 27, 2026, 2:55 AM.
Indexed evidence
13 docs / 24 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
152 days open in the visible workflow; risk score 0.00.

Claim Summary

Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/BARV600/Claims Paid AO/79994/Photo Jun 09 2026, 11 45 57 AM.jpg
Timeline
First seen Jun 1, 2026, 3:48 PM • last seen Oct 27, 2026, 2:55 AM
Evidence flags
No active evidence gap flags

Comment Intelligence

Thread depth
4 indexed side comments on this claim.
Latest visible thread signal
Jun 30, 2026, 4:15 PM • processor • paid $312.21 6/23 check #3177299
Role mix
Dealer 0 • OEM 0 • Processor 3
Decision cues
Denial signals 0 • info / missing-doc asks 0 • approval signals 0
Best move
Open the focused thread before hunting through the packet manually.

Quick Actions

Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.

Images

Claim Lines

complaint
TANKLESS WATER HEATER IS LEAKING. CUSTOMER STATES WATER WAS POURING OUT.CUSTOMER THINKS IT MAY HAVE FROZEN UP OVER THE WINTER
matched • confidence 0.77
complaint
TANKLESS WATER HEATER IS LEAKING. CUSTOMER STATES WATER WAS POURING OUT.CUSTOMER THINKS IT MAY HAVE FROZEN UP OVER THE WINTER
matched • confidence 0.77
complaint
TANKLESS WATER HEATER IS LEAKING. CUSTOMER STATES WATER WAS POURING OUT.CUSTOMER THINKS IT MAY HAVE FROZEN UP OVER THE WINTER
needs-review • confidence 0.34
cause
Water heater
matched • confidence 0.72
cause
Water heater
matched • confidence 0.72
cause
Water heater
needs-review • confidence 0.29
correction
Brought unit in. Connected to city water and turned water on. Water began to gush out top Zz 2d of watwr heater. Tankless water heater is busted. Partd request submitted for new water heater. Brought oa unit in. Recieved new water heater. Removed all screws holding in old water heater. Went inside and ) H disconnected wires from old water heater. Disconnected water lines from old water heater. Pulled out and 2 cleaned foam off door and put putty tape around door. Placed new water heater in and placed door on. EES Secured door and heater with screws. Connected water lines and wires in proper placement. Connected to oa city water and turned on Ip. Tested new water heater. Lights on water heater controls shows hot water FS © running then water heater lighting. Hot water comes out of water points. Silcioned around watwr heater Zz outside and place cover back on inside. FH tabor —mMmM— 8 — WM — . Code Description Mechanic Total Z990 MISC
matched • confidence 0.72
correction
Brought unit in. Connected to city water and turned water on. Water began to gush out top Zz 2d of watwr heater. Tankless water heater is busted. Partd request submitted for new water heater. Brought oa unit in. Recieved new water heater. Removed all screws holding in old water heater. Went inside and ) H disconnected wires from old water heater. Disconnected water lines from old water heater. Pulled out and 2 cleaned foam off door and put putty tape around door. Placed new water heater in and placed door on. EES Secured door and heater with screws. Connected water lines and wires in proper placement. Connected to oa city water and turned on Ip. Tested new water heater. Lights on water heater controls shows hot water FS © running then water heater lighting. Hot water comes out of water points. Silcioned around watwr heater Zz outside and place cover back on inside. FH tabor —mMmM— 8 — WM — . Code Description Mechanic Total Z990 MISC
matched • confidence 0.72
correction
Brought unit in. Connected to city water and turned water on. Water began to gush out top Zz 2d of watwr heater. Tankless water heater is busted. Partd request submitted for new water heater. Brought oa unit in. Recieved new water heater. Removed all screws holding in old water heater. Went inside and ) H disconnected wires from old water heater. Disconnected water lines from old water heater. Pulled out and 2 cleaned foam off door and put putty tape around door. Placed new water heater in and placed door on. EES Secured door and heater with screws. Connected water lines and wires in proper placement. Connected to oa city water and turned on Ip. Tested new water heater. Lights on water heater controls shows hot water FS © running then water heater lighting. Hot water comes out of water points. Silcioned around watwr heater Zz outside and place cover back on inside. FH tabor —mMmM— 8 — WM — . Code Description Mechanic Total Z990 MISC
needs-review • confidence 0.29

Evidence Thread

Ashlee Olsen
processor • Jun 1, 2026, 4:13 PM
submitted C#2683629
Ashlee Olsen
processor • Jun 9, 2026, 1:48 PM
@Ben H WO 79994 FR feedback: Feedback06/09/2026kpickett@forestriverinc.comFogatti has requested this part be returned once the new one has been sent to dealer. Has the part been returned to Fogatti? Please provide tracking number for returned part.
Ben Hoffman
dealer_or_external • Jun 9, 2026, 3:30 PM
@Ashlee O im working with forest river now and there is no tag waiting on a reply
Ashlee Olsen
processor • Jun 30, 2026, 4:15 PM
paid $312.21 6/23 check #3177299

Claim Files

CLAIM.pdf
main-pdf • Jun 1, 2026, 3:34 PM • 104,284 bytes
/home/openclaw/nas/Dropbox/#recycle/BARV600/Claims Submitted AO/FR sub BA-AO/79994/CLAIM.pdf
CLAIM.pdf
main-pdf • Jun 1, 2026, 3:34 PM • 104,284 bytes
/home/openclaw/nas/Dropbox/BARV600/Parts Requested/79994/CLAIM.pdf
CLAIM.pdf
main-pdf • Jun 1, 2026, 3:34 PM • 104,284 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims Submitted AO/FR sub BA-AO/79994/CLAIM.pdf
CLAIM.pdf
main-pdf • Jun 1, 2026, 3:34 PM • 104,284 bytes
/home/openclaw/nas/Dropbox/#recycle/BARV600/Claims to Process-AY/79994/CLAIM.pdf
CLAIM.pdf
main-pdf • Jun 1, 2026, 3:34 PM • 104,284 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims to Process-AY/79994/CLAIM.pdf
PREAUTH.pdf
main-pdf • Jun 1, 2026, 3:34 PM • 869,911 bytes
/home/openclaw/nas/Dropbox/#recycle/BARV600/Claims Submitted AO/FR sub BA-AO/79994/PREAUTH.pdf
PREAUTH.pdf
main-pdf • Jun 1, 2026, 3:34 PM • 869,911 bytes
/home/openclaw/nas/Dropbox/BARV600/Parts Requested/79994/PREAUTH.pdf
PREAUTH.pdf
main-pdf • Jun 1, 2026, 3:34 PM • 869,911 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims Submitted AO/FR sub BA-AO/79994/PREAUTH.pdf
PREAUTH.pdf
main-pdf • Jun 1, 2026, 3:34 PM • 869,911 bytes
/home/openclaw/nas/Dropbox/#recycle/BARV600/Claims to Process-AY/79994/PREAUTH.pdf
RO 79994.pdf
pdf • Jun 1, 2026, 3:34 PM • 872,563 bytes
/home/openclaw/nas/Dropbox/#recycle/BARV600/Claims Submitted AO/FR sub BA-AO/79994/RO 79994.pdf
RO 79994.pdf
pdf • Jun 1, 2026, 3:34 PM • 872,563 bytes
/home/openclaw/nas/Dropbox/BARV600/Parts Requested/79994/RO 79994.pdf
RO 79994.pdf
pdf • Jun 1, 2026, 3:34 PM • 872,563 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims Submitted AO/FR sub BA-AO/79994/RO 79994.pdf
RO 79994.pdf
pdf • Jun 1, 2026, 3:34 PM • 872,563 bytes
/home/openclaw/nas/Dropbox/#recycle/BARV600/Claims to Process-AY/79994/RO 79994.pdf