Claim explorer / evidence thread
Claim 25299
TRI 1202 • Ashlee • Paid • forest-river
risk 0.00
deadline Overdue / escalation ready
images 0
matched 0
review 18
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
119d elapsed • 0d remaining
Analyzed
Completed stage
119d elapsed • 0d remaining
Awaiting OEM
Completed stage
119d elapsed • 0d remaining
Auto-Approved
Completed stage
119d elapsed • 0d remaining
Payment Due
Completed stage
119d elapsed • 0d remaining
Escalation Eligible
Completed stage
119d elapsed • 0d remaining
Resolved
Overdue / escalation ready
119d elapsed • 0d remaining • Overdue
AI Claim Analysis
Estimated Recovery Amount
Pending payment match
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
18
No active evidence gaps are listed.
Deadline Status
Overdue / escalation ready
119 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
16
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: May 7, 2026, 5:05 AM to Sep 1, 2026, 2:57 AM.
Indexed evidence
4 docs / 14 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
119 days open in the visible workflow; risk score 0.00.
Claim Summary
Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/TRI 1202/8-Claims Paid/25299/PD CHECK.pdf
Timeline
First seen May 7, 2026, 5:05 AM • last seen Sep 1, 2026, 2:57 AM
Evidence flags
No active evidence gap flags
Comment Intelligence
Thread depth
8 indexed side comments on this claim.
Latest visible thread signal
May 28, 2025, 1:41 PM • processor • paid $649.51 5/28 check #2969501
Role mix
Dealer 0 • OEM 0 • Processor 6
Decision cues
Denial signals 0 • info / missing-doc asks 2 • approval signals 1
Best move
Work missing-doc or reply asks first from the thread.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
Claim Lines
complaint
TRIM IN MASTER BEDROOM CLOSET IS COMING DOWN ON LEFT SIDE AT THE TOP
needs-review • confidence 0.06
cause
TRIM CAME LOOSE AND FALLING DOWN *92336*
needs-review • confidence 0.13
correction
RESECURE TRIM BACK IN PLACE
needs-review • confidence 0.04
complaint
MASTER BEDROOM CLOSET DOOR IS POPPING WHEN CUSTOMER TRIES TO OPEN/CLOSE *DURING WALK THROUGH WITH CUST COULD NOT GET DOORS TO POP* CORRECTION: TECH COULD NOT DUPLICATE PROBLEM. Subtotal for Job #4: 0.00 Job #5 - Warranty COMPLAINT: UP THE STEPS TO THE BEDROOM ON THE LEFT NEAR FLOOR SEAM TAPE IS COMING LOOSE
needs-review • confidence 0.15
cause
SEAM TAPE CAME LOOSE
needs-review • confidence 0.13
correction
RESECURE WITH ADHISIVE BACK INTO PLACE
needs-review • confidence 0.00
complaint
WIRE HANGING UNDER THE REAR SLIDE OUT CUSTOMER WOULD LIKE TO HAVE THIS RESECURED
needs-review • confidence 0.29
cause
SCREW WAS NOT INSTALLED INTO THE ZIP TIE THAT HOLDS THE WIRES IN PLACE.
needs-review • confidence 0.22
correction
NEED TO REMOVE THE FASCIA AND SECURE ALL WIRES IN PLACE CORRECTLY, REINSTALL FASCIA.
needs-review • confidence 0.22
complaint
PIN WILL NOT GO ALL THE WAY THROUGH THE HAND RAIL AT THE ENTRY DOOR
needs-review • confidence 0.09
cause
HAND RAIL IS WARPED NOT ALLOWING THE PIN TO BE INSERTED AS DESIGNED
needs-review • confidence 0.03
correction
REPLACE THE HAND RAIL
needs-review • confidence 0.06
complaint
BEDROOM DRAWER ON RIGHT SIDE WILL NOT CLOSE CORRECTLY AND LOOSE
needs-review • confidence 0.20
cause
DRAWER GUIDE IS FAULTY AND NOT ALLOWING THE DRAWER TO CLOSE ALL THE WAY. DRAWER GUIDE SEEMS TO BE INSTALLED SIDEWAYS DUE TO THE DRAWER WHEN TECH CLOSED IT HAS A GAP ON ONE SIDE. LIVESAY, JOHN Customer #: 92336
needs-review • confidence 0.23
correction
REMOVE AND REPLACE THE DRAWER GUIDES
needs-review • confidence 0.17
complaint
PLACE OVER THE BED ON THE RIGHT SIDE AT THE TOP,LOOKS LIKE THE WALL COMES OUT MORE THAN IT SHOULD. BLUE TAPE MARKS THE AREA.
needs-review • confidence 0.29
cause
WHEN BUILT THE WALL WAS NOT EVEN WITH THE OTHER PIECE OF WOOD BESIDE OF IT. THIS IS CAUSING THE SEAM TAPE TO POP OFF AND MAKES THIS PART OF WALL STICK OUT. *92336*
needs-review • confidence 0.26
correction
R&R CEILING TRIM, PULL OVERLAY OF PAPER OFF TO BE ABLE TO SAND THE WALL TO BE EVEN WITH THE OTHER SIDE. THEN APPLY NEW OVERLAY PAPER AND SEAM TAPE.AREA WILL NEED TO BE CLEANED FROM THE WOOD WORK.
needs-review • confidence 0.26
Evidence Thread
Ashlee Olsen
processor • Apr 23, 2025, 12:15 PM
@Stephanie D Hi! Can you upload the WO for this one please?
Stephanie Davis
dealer_or_external • Apr 23, 2025, 12:33 PM
It's there now! sorry!
Ashlee Olsen
processor • Apr 23, 2025, 1:59 PM
submitted PA#2274175
Ashlee Olsen
processor • Apr 23, 2025, 5:04 PM
Sent to vendor for review
Ashlee Olsen
processor • Apr 24, 2025, 11:16 AM
line 3 .2
line 5 .2
line 6 1
line 7 .2 PER MORryde: This is approved on RGA #04232025022 for .20 hours for the dealer to drill out the holes and touch up with paint. No parts need to be replaced.
line 8 .2
line 9 2
Stephanie Davis
dealer_or_external • Apr 25, 2025, 3:47 PM
@Chris L WO is in serv drawer for repairs
Ashlee Olsen
processor • May 15, 2025, 11:34 AM
submitted C#2274175
Ashlee Olsen
processor • May 28, 2025, 1:41 PM
paid $649.51 5/28 check #2969501
Claim Files
PD CHECK.pdf
pdf • Jun 3, 2025, 9:58 AM • 403,638 bytes
/home/openclaw/nas/Dropbox/TRI 1202/8-Claims Paid/25299/PD CHECK.pdf
Paid claim.pdf
pdf • May 28, 2025, 1:42 PM • 517,108 bytes
/home/openclaw/nas/Dropbox/TRI 1202/8-Claims Paid/25299/Paid claim.pdf
COMPLETED WORK ORDER.pdf
pdf • May 15, 2025, 10:06 AM • 421,521 bytes
/home/openclaw/nas/Dropbox/TRI 1202/8-Claims Paid/25299/COMPLETED WORK ORDER.pdf
25299.pdf
main-pdf • Apr 23, 2025, 12:32 PM • 418,299 bytes
/home/openclaw/nas/Dropbox/TRI 1202/8-Claims Paid/25299/25299.pdf