Claim explorer / evidence thread
Claim 11447B
GRE 8220 • Alix • Paid • grand-design
risk 0.00
deadline Overdue / escalation ready
images 0
matched 0
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
118d elapsed • 0d remaining
Analyzed
Completed stage
118d elapsed • 0d remaining
Awaiting OEM
Completed stage
118d elapsed • 0d remaining
Auto-Approved
Completed stage
118d elapsed • 0d remaining
Payment Due
Completed stage
118d elapsed • 0d remaining
Escalation Eligible
Completed stage
118d elapsed • 0d remaining
Resolved
Overdue / escalation ready
118d elapsed • 0d remaining • Overdue
AI Claim Analysis
Estimated Recovery Amount
Pending payment match
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
0
No active evidence gaps are listed.
Deadline Status
Overdue / escalation ready
118 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
37
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Full evidence packet
Estimated packet is large. Prepare a concise executive chronology with full backup evidence separated.
Chronology
Ready to order
Visible span: May 7, 2026, 5:05 AM to Jun 25, 2026, 2:54 AM.
Indexed evidence
14 docs / 19 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
118 days open in the visible workflow; risk score 0.00.
Claim Summary
Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/11447B/Print Claim 875870.pdf
Timeline
First seen May 7, 2026, 5:05 AM • last seen Jun 25, 2026, 2:54 AM
Evidence flags
No active evidence gap flags
Comment Intelligence
Thread depth
49 indexed side comments on this claim.
Latest visible thread signal
Mar 13, 2025, 8:31 AM • processor • This paid on 3/12/25 on check 593380
Role mix
Dealer 0 • OEM 0 • Processor 25
Decision cues
Denial signals 0 • info / missing-doc asks 20 • approval signals 7
Best move
Work missing-doc or reply asks first from the thread.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
Claim Lines
No claim lines loaded
Evidence Thread
Alix Mongiat
processor • Jan 2, 2025, 2:43 PM
PA 832549 was submitted for approval.
Alix Mongiat
processor • Jan 6, 2025, 7:30 AM
This is pending GD management review.
Alix Mongiat
processor • Jan 8, 2025, 8:16 AM
Sent GD an email requesting an update.
Alix Mongiat
processor • Jan 9, 2025, 9:15 AM
@Kaitlyn R @michelle g @Morgan Z This was approved for 42 hours (requested 56)
Morgan Zywicki
dealer_or_external • Jan 9, 2025, 11:48 AM
Looking into our service management guide I had found that in the roof key fast formulas there is a rubber roofs, replacement complete and that quotes 1.50 hours per foot. The unit is 37 ft in length and when multiplying that by the 1.50 we end up with 55.5 for hours it would take to do a complete R&R of this roof. The 42 hours would not be enough. We will need the 56 hours
Alix Mongiat
processor • Jan 9, 2025, 12:05 PM
I have emailed GD with this information. I will keep you updated. Moving back to PA's pending for now.
Morgan Zywicki
dealer_or_external • Jan 9, 2025, 12:06 PM
Thank you!
Morgan Zywicki
dealer_or_external • Jan 9, 2025, 1:02 PM
There is also roof decking that we need to replace. I forgot to mention that in the last comment
Morgan Zywicki
dealer_or_external • Jan 9, 2025, 1:11 PM
its 2 hours of labor for the roof decking and we need to install 1 sheet. sorry for not adding this before
Alix Mongiat
processor • Jan 9, 2025, 2:05 PM
Added comments to email. Thank you.
Morgan Zywicki
dealer_or_external • Jan 9, 2025, 2:15 PM
Thank you and sorry for that confusion
Alix Mongiat
processor • Jan 10, 2025, 10:20 AM
@Morgan Z From GD:
For this unit is for roof membrane—38 ft. x 1 hr. per ft.
And you added in the pre auth. 2 decking boards which I give you 2 hrs. each total 4 hrs. which comes to 42 hrs. which management approved.
Alix Mongiat
processor • Jan 10, 2025, 10:21 AM
Moving back to PA's approved.
Morgan Zywicki
dealer_or_external • Jan 10, 2025, 11:36 AM
Is this just for the rubber membrane or does this also include the R&I for the solar panel, ac unit, and the mushroom vents on top of the roof? The estimate that I had given includes the R&I of all the vents, ac, and solar panel along with the roof membrane. Could you please verify that this is correct with GD as well?
Alix Mongiat
processor • Jan 10, 2025, 11:41 AM
@Morgan Z The R&I for the solar panel, ac unit, and mushroom vents were not on the work order that I can see so that wasn't put in the PA. I will email them this information and see if they will give extra time for that. Thank you.
Morgan Zywicki
dealer_or_external • Jan 10, 2025, 11:53 AM
Sounds good. Thank you
Alix Mongiat
processor • Jan 15, 2025, 8:28 AM
@Morgan Z From GD: Yes, that includes all the R&I of the roof attachments.
Email added to folder, moving to PA approved.
Morgan Zywicki
dealer_or_external • Jan 15, 2025, 8:56 AM
I have included the labor code from the service management guide that we have and it would state that we would need 56 hours for the roof repair itself and then with two sheets of decking being at 2 hours per sheet it would put us at 60 hours for the whole roof R&R
Alix Mongiat
processor • Jan 15, 2025, 10:43 AM
@Morgan Z I don't see what flat rate codes you are talking about. Please advise.
Morgan Zywicki
dealer_or_external • Jan 15, 2025, 10:47 AM
I UPLOADED A NEW PHOTO WHERE THE RATE IS CIRCLED
Morgan Zywicki
dealer_or_external • Jan 15, 2025, 10:47 AM
THE ORIGINAL PHOTOS DID NOT UPLOAD
Alix Mongiat
processor • Jan 15, 2025, 10:57 AM
Sent GD an email with this information. I will keep you posted once I hear back.
Morgan Zywicki
dealer_or_external • Jan 15, 2025, 10:59 AM
THANK YOU
Morgan Zywicki
dealer_or_external • Jan 17, 2025, 9:16 AM
@Alix M any update on this
Alix Mongiat
processor • Jan 17, 2025, 9:30 AM
No, I sent a follow up email again earlier this morning. I will update as soon as I hear back from them. Thanks.
Morgan Zywicki
dealer_or_external • Jan 17, 2025, 9:53 AM
Thanks
Alix Mongiat
processor • Jan 17, 2025, 11:21 AM
From GD: Our GD labor rate is 1 hr. per ft. which include the membrane and the luan
Alix Mongiat
processor • Jan 17, 2025, 11:21 AM
Moving back to PA’s approved.
Morgan Zywicki
dealer_or_external • Jan 17, 2025, 11:23 AM
OKAY
Morgan Zywicki
dealer_or_external • Feb 20, 2025, 3:05 PM
WORK COMPLETED ON 2/19/25
REQUESTING AN ADDITIONAL 4 HOURS ON THIS AS 2 MORE SHEETS OF DECKING NEEDED TO BE USED IN THIS REPAIR
PARTS USED
677917012251-EPDM PLUS 96 X 40 WHITE
COST:834.07
PRICE:1,076.26
QTY:1
756815008754-MUSHROOM STYLE PLUMBING VENT / WHT
COST:7.60
PRICE: 17.00
QTY:2
82201118-BUTYL TAPE 1/8"X1"X30' BLACK
COST: 6.53
PRICE: 14.82
QTY: 4
822070447-TRIM NON-INSERT 108" BLACK LG J MOLD
COST: 13.65
PRICE: 17.75
QTY:1
146878-NOVAFLEX SEALANT TRANSLUCENT
COST: 6.93
PRICE: 8.98
QTY: 1
677917000661-10.3oz LAP SEALANT WHITE
COST: 6.86
PRICE: 9.05
QTY: 13
51704751-MAXXFAN, OEM MODEL ELECT(
COST: 319.15
PRICE: 414.90
822020945-SOLAR ROOF TOP ELECTRICAL BOX GEN2 MC4 BLK FSEB30JWO2-BL
COST: 25.83
PRICE: 33.58
QTY: 1
Morgan Zywicki
dealer_or_external • Feb 20, 2025, 3:12 PM
INSULATION
COST: 10.00
PRICE: 20.00
QTY:1
HOME DEPOT OSB
COST: 16.54
PRICE: 20.00
QTY:4
FREIGHT FOR NON-INSERT TRIM
COST:15.15
PRICE:15.15
QTY:1
Morgan Zywicki
dealer_or_external • Feb 20, 2025, 3:13 PM
I AM ADDING A COPY OF THE TECHS NOTES FROM THE R&R OF THE ROOF
Morgan Zywicki
dealer_or_external • Feb 20, 2025, 3:13 PM
1001 CUSTOMER REQUESTED.
The manufacturer couldn't hit the pre-drilled holes in two pancake vents and one solar plug-in, and it caused all three to crack and let moisture in damaging four pieces of decking. The manufacturer also missed the pre-drilled holes on the rear power vent, causing it to crack.
Their are a few small holes in the sealant that I cleaned and sealed.
The previous year that I did a roof inspection, i noticed and noted an area by the a/c that didn't look right, but it isn't soft. This year their is a 32x48 section that is soft. There are no punctures in the fabric, and the only thing mounted in the roof in that area is a pancake vent, and all the sealant looks good around it. The only thing i can see that could possibly let water in is the back side of the vent has a cut out and water/snow could have got in there over the winter and somehow got underneath the alpha sealant causing the wood to rot.
Two other areas are starting to do the same thing as what happened by the rear a/c. Im willing to bet by spring both sections will be soft as well.
I'm recommending a complete roof replacement with two sheets of decking.
I went inside and disconnected the a/cs. I cut the sealant around all the roof fixtures, and i can see that two pancake vents, one solar plug-in, and one power vent are cracked because the manufacturer couldn't hit the existing holes I removed all the screws and removed everything on the roof. I removed the front, rear, and side screw tracks, cut the membrane into strips, and peeled the membrane off. I removed the screws that I could in the damaged decking and used a pry bar to take the four pieces of decking off. I pulled all the remaining screws that will get in the way of the new decking, peeled the thermal barrier back, removed any damaged insulation, and let the roof dry out. While the roof was drying out, i used the old decking as templates and cut out the new decking. I put new insulation in the roof, stapled the thermal barrier back in place, and put the new sheets of decking in place. I screwed the decking down and went around the edges and seams with fiba-tape. I grabbed Jo and Cody, and we rolled out the new fabric. I cleaned the sealant and putty off of all the roof fixtures and screw tracks and re puttied everything. The new vent has a different color lid so i swapped the lids. I put all the screw tracks back on, and the roof membrane won't tuck under the front cap very far, so I added a secondary screw track. I taped off the side tracks and sealed along the top edge with non leveling dicor and used silicone along the bottom edges. I put everything back on the roof and sealed around everything with dicor.
Morgan Zywicki
dealer_or_external • Feb 20, 2025, 3:15 PM
PHOTOS HAVE ALSO BEEN UPLOADED FOR THE CRACKED MUSHROOM VENTS, SOLAR MOUNT, AND FAN COVER. THE TECH NOTES HAVE BEEN ADDED IN SO WHEN REQUESTING THE ADDITIONAL 4 HOURS YOU HAVE SOMETHING ELSE TO SEND IN HELPING TO JUSTIFY THE ADDITIONAL HOURS
Morgan Zywicki
dealer_or_external • Feb 20, 2025, 3:16 PM
@Alix M
Alix Mongiat
processor • Feb 20, 2025, 3:34 PM
I have sent an email to GD requesting the additional 4 hours. I am moving this to ready to submit.
Morgan Zywicki
dealer_or_external • Feb 20, 2025, 3:48 PM
OKAY I WASN'T SURE IF I HAD TO MOVE IT THERE OR IF YOU WOULD HAVE TO MOVE IT TO PENDING APPROVAL WITH REQUESTING MORE TIME
Alix Mongiat
processor • Feb 21, 2025, 1:29 PM
@Morgan Z This was approved for an additional 2 hours.
Alix Mongiat
processor • Feb 21, 2025, 1:30 PM
Let me know if you are okay with that and I will submit for payment.
Alix Mongiat
processor • Feb 21, 2025, 4:16 PM
@Bonnie K @Morgan Z Please upload invoices as well. Thank you!
Bonnie Korte
dealer_or_external • Feb 21, 2025, 5:14 PM
@Alix M INVOICES HAVE BEEN UPLOADED
Alix Mongiat
processor • Feb 21, 2025, 6:02 PM
@Bonnie K @Morgan Z Thank you! Are you okay with them only approving an additional 2 hours rather than the 4 you requested? I will submit once I get approval from you.
Alix Mongiat
processor • Feb 21, 2025, 6:26 PM
Claim 875870 is in draft status until I get the go ahead from Greeneway regarding the 2 additional hours approved.
Bonnie Korte
dealer_or_external • Feb 24, 2025, 9:44 AM
@Alix M IF THAT IS ALL THEY WILL GIVE US THEN GO AHEAD WITH THE ADDITIONAL 2 HOURS
Alix Mongiat
processor • Feb 25, 2025, 8:12 AM
Claim 875870 has been submitted for payment.
Alix Mongiat
processor • Mar 4, 2025, 9:49 AM
@Morgan Z @Bonnie K From GD: ***pending for home depot receipt - i do not find it attached -
Bonnie Korte
dealer_or_external • Mar 4, 2025, 9:55 AM
@Alix M THE RECEIPT HAS BEEN UPLOADED
Alix Mongiat
processor • Mar 4, 2025, 1:28 PM
Uploaded receipt to claim. @Morgan Z @Bonnie K Don't forget to move these to folder 7.3 "Claims Corrected" once you provide the requested information. Thank you!
Alix Mongiat
processor • Mar 13, 2025, 8:31 AM
This paid on 3/12/25 on check 593380
Claim Files
Print Claim 875870.pdf
pdf • Mar 13, 2025, 8:31 AM • 16,958 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/11447B/Print Claim 875870.pdf
HOME DEPOT.pdf
pdf • Mar 4, 2025, 9:54 AM • 108,758 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/HOME DEPOT.pdf
7511067.pdf
main-pdf • Feb 28, 2025, 2:18 PM • 172,408 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/7511067.pdf
306973333.pdf
main-pdf • Feb 21, 2025, 5:15 PM • 156,650 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/306973333.pdf
1343737.pdf
main-pdf • Feb 21, 2025, 5:13 PM • 12,534 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/1343737.pdf
A000283809.pdf
main-pdf • Feb 21, 2025, 5:05 PM • 66,195 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/A000283809.pdf
5757071.pdf
main-pdf • Feb 21, 2025, 4:45 PM • 94,600 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/5757071.pdf
1372906.pdf
main-pdf • Feb 21, 2025, 4:44 PM • 12,524 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/1372906.pdf
6039901.pdf
main-pdf • Feb 21, 2025, 4:43 PM • 93,911 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/6039901.pdf
P945957.pdf
main-pdf • Feb 21, 2025, 4:43 PM • 75,820 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/P945957.pdf
A000477318.pdf
main-pdf • Feb 21, 2025, 4:37 PM • 66,171 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/A000477318.pdf
Integrity Management Advisors Mail - Pre-Auth #832549 - roof attachments.pdf
mail-artifact • Jan 15, 2025, 8:28 AM • 79,624 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/11447B/Integrity Management Advisors Mail - Pre-Auth #832549 - roof attachments.pdf
Integrity Management Advisors Mail - Pre-Auth #832549.pdf
mail-artifact • Jan 10, 2025, 10:20 AM • 227,735 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/11447B/Integrity Management Advisors Mail - Pre-Auth #832549.pdf
TRUDELL WORK ORDER.pdf
pdf • Jan 2, 2025, 1:59 PM • 74,280 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/11447B/11447B/TRUDELL WORK ORDER.pdf