Claim explorer / evidence thread
Claim 73897
BARV600 • Ashlee • Paid • 73897
risk 0.70
deadline Overdue / escalation ready
images 58
matched 0
gaps 1
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
131d elapsed • 0d remaining
Analyzed
Completed stage
131d elapsed • 0d remaining
Awaiting OEM
Completed stage
131d elapsed • 0d remaining
Auto-Approved
Completed stage
131d elapsed • 0d remaining
Payment Due
Completed stage
131d elapsed • 0d remaining
Escalation Eligible
Completed stage
131d elapsed • 0d remaining
Resolved
Overdue / escalation ready
131d elapsed • 0d remaining • Overdue
AI Claim Analysis
Estimated Recovery Amount
$375.00
What this claim may still be worth based on current evidence.
Compliance Score
30/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
1
missing_unit_id_photo • damage_signal_without_damage_photo
Deadline Status
Overdue / escalation ready
131 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
18
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: Apr 23, 2026, 3:33 PM to Apr 27, 2026, 11:54 PM.
Indexed evidence
3 docs / 24 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
131 days open in the visible workflow; risk score 0.70.
Claim Summary
Evidence summary
images=58; damage=0; unit=0; parts=0; doc=46; gaps=missing_unit_id_photo,damage_signal_without_damage_photo • Unit 2024 Nucamp • VIN 7M5TD2922RC302222
Path
/home/openclaw/nas/Dropbox/BARV600/Claims Paid AO/73897/WO_73897_JOB_2_2024.06.12_14.30.21.jpg
Timeline
First seen Apr 23, 2026, 3:33 PM • last seen Apr 27, 2026, 11:54 PM
Evidence flags
missing unit id photo • damage signal without damage photo
Comment Intelligence
Thread depth
2 indexed side comments on this claim.
Latest visible thread signal
Sep 25, 2024, 12:06 PM • processor • paid $962.47
Role mix
Dealer 0 • OEM 0 • Processor 2
Decision cues
Denial signals 0 • info / missing-doc asks 0 • approval signals 0
Best move
Open the focused thread before hunting through the packet manually.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
Claim Lines
cause
Set up sprinkler. There are holes on both compartment doors where the latch was Time Allowed: 1.5 removed. Factory applied silicone over these holes and it has failed to keep water out. Need to Sublet Repairs: 0.00 replace both doors. Remedy: NEED TO REPLACE BOTH COMPARTMENT DOOR Part Return Req: No Status: Approved Operation Line 2 Flat Rate Code: 12090 VENT - EXTERIOR SIDEWALL - Fault Code: LEAKS REPLACE Serial #: Model #: Notes: Problem: DURING A RAIN STORM WATER CAME INTO THE CABINET UNDER THE KITCHEN Time Requested: .4 SINK AND HE BELIEVES IT CAME IN FROM THE FURNANCE VENT/ WATER HEATER. Time Allowed: .4
gap • confidence 0.73
cause
Set up sprinkler. There are holes on both compartment doors where the latch was Time Allowed: 1.5 removed. Factory applied silicone over these holes and it has failed to keep water out. Need to Sublet Repairs: 0.00 replace both doors. Remedy: NEED TO REPLACE BOTH COMPARTMENT DOOR Part Return Req: No Status: Approved Operation Line 2 Flat Rate Code: 12090 VENT - EXTERIOR SIDEWALL - Fault Code: LEAKS REPLACE Serial #: Model #: Notes: Problem: DURING A RAIN STORM WATER CAME INTO THE CABINET UNDER THE KITCHEN Time Requested: .4 SINK AND HE BELIEVES IT CAME IN FROM THE FURNANCE VENT/ WATER HEATER. Time Allowed: .4
unreviewed • confidence 0.00
cause
Set up sprinkler. There are holes on both compartment doors where the latch was Time Allowed: 1.5 removed. Factory applied silicone over these holes and it has failed to keep water out. Need to Sublet Repairs: 0.00 replace both doors. Remedy: NEED TO REPLACE BOTH COMPARTMENT DOOR Part Return Req: No Status: Approved Operation Line 2 Flat Rate Code: 12090 VENT - EXTERIOR SIDEWALL - Fault Code: LEAKS REPLACE Serial #: Model #: Notes: Problem: DURING A RAIN STORM WATER CAME INTO THE CABINET UNDER THE KITCHEN Time Requested: .4 SINK AND HE BELIEVES IT CAME IN FROM THE FURNANCE VENT/ WATER HEATER. Time Allowed: .4
unreviewed • confidence 0.00
cause
Set up sprinkler. There are holes on both compartment doors where the latch was Time Allowed: 1.5 removed. Factory applied silicone over these holes and it has failed to keep water out. Need to Sublet Repairs: 0.00 replace both doors. Remedy: NEED TO REPLACE BOTH COMPARTMENT DOOR Part Return Req: No Status: Approved Operation Line 2 Flat Rate Code: 12090 VENT - EXTERIOR SIDEWALL - Fault Code: LEAKS REPLACE Serial #: Model #: Notes: Problem: DURING A RAIN STORM WATER CAME INTO THE CABINET UNDER THE KITCHEN Time Requested: .4 SINK AND HE BELIEVES IT CAME IN FROM THE FURNANCE VENT/ WATER HEATER. Time Allowed: .4
unreviewed • confidence 0.00
cause
Set up sprinkler. There are holes on both compartment doors where the latch was Time Allowed: 1.5 removed. Factory applied silicone over these holes and it has failed to keep water out. Need to Sublet Repairs: 0.00 replace both doors. Remedy: NEED TO REPLACE BOTH COMPARTMENT DOOR Part Return Req: No Status: Approved Operation Line 2 Flat Rate Code: 12090 VENT - EXTERIOR SIDEWALL - Fault Code: LEAKS REPLACE Serial #: Model #: Notes: Problem: DURING A RAIN STORM WATER CAME INTO THE CABINET UNDER THE KITCHEN Time Requested: .4 SINK AND HE BELIEVES IT CAME IN FROM THE FURNANCE VENT/ WATER HEATER. Time Allowed: .4
unreviewed • confidence 0.00
cause
HOOKED UP SPRINKLER AND RAN OVER WATER HEATER AND FURNACE. Sublet Repairs: 0.00 REMOVED DRAWER INSIDE OF THE KITCHEN. WATER IS COMING THROUGH FURNACE. FURNACE EXHAUST VENT IS NOT SEALED PROPERLY AND THE FLANGE FOR THE ACCESS PANEL NEED PUTTY TAPE CLEANED AND REMOVED FROM EDGES AND SILICONE APPLIED OVER THE EDGES. Remedy: LET AREA DRY. CLEANED PUTTY TAPE AND APPLIED BEAD OF SILICONE AROUND IT. DRIED EXHAUST PORT AND SEALED WITH SILICONE. WILL LET SILICONE DRY AND RETEST. Part Return Req: No Status: Approved
partial-match • confidence 0.73
cause
HOOKED UP SPRINKLER AND RAN OVER WATER HEATER AND FURNACE. Sublet Repairs: 0.00 REMOVED DRAWER INSIDE OF THE KITCHEN. WATER IS COMING THROUGH FURNACE. FURNACE EXHAUST VENT IS NOT SEALED PROPERLY AND THE FLANGE FOR THE ACCESS PANEL NEED PUTTY TAPE CLEANED AND REMOVED FROM EDGES AND SILICONE APPLIED OVER THE EDGES. Remedy: LET AREA DRY. CLEANED PUTTY TAPE AND APPLIED BEAD OF SILICONE AROUND IT. DRIED EXHAUST PORT AND SEALED WITH SILICONE. WILL LET SILICONE DRY AND RETEST. Part Return Req: No Status: Approved
unreviewed • confidence 0.00
cause
HOOKED UP SPRINKLER AND RAN OVER WATER HEATER AND FURNACE. Sublet Repairs: 0.00 REMOVED DRAWER INSIDE OF THE KITCHEN. WATER IS COMING THROUGH FURNACE. FURNACE EXHAUST VENT IS NOT SEALED PROPERLY AND THE FLANGE FOR THE ACCESS PANEL NEED PUTTY TAPE CLEANED AND REMOVED FROM EDGES AND SILICONE APPLIED OVER THE EDGES. Remedy: LET AREA DRY. CLEANED PUTTY TAPE AND APPLIED BEAD OF SILICONE AROUND IT. DRIED EXHAUST PORT AND SEALED WITH SILICONE. WILL LET SILICONE DRY AND RETEST. Part Return Req: No Status: Approved
unreviewed • confidence 0.00
cause
HOOKED UP SPRINKLER AND RAN OVER WATER HEATER AND FURNACE. Sublet Repairs: 0.00 REMOVED DRAWER INSIDE OF THE KITCHEN. WATER IS COMING THROUGH FURNACE. FURNACE EXHAUST VENT IS NOT SEALED PROPERLY AND THE FLANGE FOR THE ACCESS PANEL NEED PUTTY TAPE CLEANED AND REMOVED FROM EDGES AND SILICONE APPLIED OVER THE EDGES. Remedy: LET AREA DRY. CLEANED PUTTY TAPE AND APPLIED BEAD OF SILICONE AROUND IT. DRIED EXHAUST PORT AND SEALED WITH SILICONE. WILL LET SILICONE DRY AND RETEST. Part Return Req: No Status: Approved
unreviewed • confidence 0.00
cause
HOOKED UP SPRINKLER AND RAN OVER WATER HEATER AND FURNACE. Sublet Repairs: 0.00 REMOVED DRAWER INSIDE OF THE KITCHEN. WATER IS COMING THROUGH FURNACE. FURNACE EXHAUST VENT IS NOT SEALED PROPERLY AND THE FLANGE FOR THE ACCESS PANEL NEED PUTTY TAPE CLEANED AND REMOVED FROM EDGES AND SILICONE APPLIED OVER THE EDGES. Remedy: LET AREA DRY. CLEANED PUTTY TAPE AND APPLIED BEAD OF SILICONE AROUND IT. DRIED EXHAUST PORT AND SEALED WITH SILICONE. WILL LET SILICONE DRY AND RETEST. Part Return Req: No Status: Approved
unreviewed • confidence 0.00
Evidence Thread
Ashlee Olsen
processor • Sep 5, 2024, 5:57 PM
submitted C#64202
Ashlee Olsen
processor • Sep 25, 2024, 12:06 PM
paid $962.47
Claim Files
CLAIM.pdf
main-pdf • Sep 5, 2024, 5:54 PM • 641,984 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims Paid AO/73897/CLAIM.pdf
RO 73897.pdf
pdf • Sep 5, 2024, 5:54 PM • 861,167 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims Paid AO/73897/RO 73897.pdf
PREAUTH.pdf
main-pdf • Sep 5, 2024, 5:50 PM • 13,354 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims Paid AO/73897/PREAUTH.pdf