Claim explorer / evidence thread
Claim 73738
MYRV 12024 • Stephanie • OEM Review • prime-time
risk 0.00
deadline Approaching deadline
images 0
matched 1
review 9
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
42d elapsed • 0d remaining
Analyzed
Completed stage
42d elapsed • 0d remaining
Awaiting OEM
Completed stage
42d elapsed • 0d remaining
Auto-Approved
Completed stage
42d elapsed • 0d remaining
Payment Due
Approaching deadline
42d elapsed • 3d remaining
Escalation Eligible
Upcoming statutory deadline
42d elapsed • 0d remaining
Resolved
Upcoming statutory deadline
42d elapsed • 0d remaining
AI Claim Analysis
Estimated Recovery Amount
$250.00
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
1
OEM Response Deadline Exceeded
Missing Items
9
No active evidence gaps are listed.
Deadline Status
Approaching deadline
42 days open in the visible workflow.
Recommended Action
Review Short-Pay
This is the fastest next move from the current workflow stage.
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
5
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: Jul 21, 2026, 2:30 PM to Jul 27, 2026, 2:54 AM.
Indexed evidence
2 docs / 0 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Monitor
42 days open in the visible workflow; risk score 0.00.
Claim Summary
Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/MYRV 12024/7- Claims in Process/7.1- Claims Submitted- iCS/Prime Time/73738/73738F.pdf
Timeline
First seen Jul 21, 2026, 2:30 PM • last seen Jul 27, 2026, 2:54 AM
Evidence flags
No active evidence gap flags
Comment Intelligence
Thread depth
3 indexed side comments on this claim.
Latest visible thread signal
Jul 28, 2026, 12:10 PM • processor • Paid $237.64 check 3199947 7/28/2026
Role mix
Dealer 0 • OEM 0 • Processor 3
Decision cues
Denial signals 0 • info / missing-doc asks 0 • approval signals 0
Best move
Open the focused thread before hunting through the packet manually.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
No browser-previewable images were available for this claim yet.
Claim Lines
complaint
DEWINTERIZE
needs-review • confidence 0.00
cause
Dewinterize
needs-review • confidence 0.00
correction
Complete Estimated Amount: 1,000.00
needs-review • confidence 0.00
complaint
6K EAZ LIFT ELITE S
needs-review • confidence 0.00
cause
6k hitch
needs-review • confidence 0.00
correction
Installed Estimated Amount: 555.00
needs-review • confidence 0.04
complaint
SOLAR INOP
partial-match • confidence 0.39
cause
No power from solar to controller
partial-match • confidence 0.39
correction
Found during the SFD double checking the solar after connecting a new battery to the unit first checked it was still preset for the flooded. Battery flooded battery was fully charged. Began checking and did not see a charge coming from the solar into the solar panel pull the wires check the DC voltage coming from the solar panel at 00 voltage Got on the roof to disconnect the solar panel from the roof cap and found the roof cap was under the solar panel the only way to access the roof cap to check if the solar panel was putting out any voltage was to remove the solar panel from the roof, however when I attempted to unbolt it from the brackets screwed to *73738* the roof, found that they would not unbolt without a ranch on the backside. Theyre so close to the roof that you cannot get a wrench on those bolts. Scraped off all sealant on the mounting brackets to the roof unscrewed. The solar panel from the roof, lifted the solar panel up and out of the way disconnected the solar panel from the roof cap tested voltage at 20 V. Scrape the sealant off of the roof cap pull these four screws out. Remove the roof cap. Double check the wire nuts to the wire in the ceiling was clamp tight reconnected the solar panel to the roof cap check the voltage at the wire nut 00 voltage determine that the roof cap had gone bad obtained a new roof. Cap went to the roof connected it prior to connecting it to the wire harness check the voltage through the roof cap and found the exact same issue no voltage on the inside of the roof cap. Began for their testing, found that the positive wire coming from the control box under the solar panel to the quick disconnect had power however, when plugged into the roof cap, the connection inside they quick disconnect was not making proper contact. Therefore power could not go through when testing continuity from the control box on the positive side all the way through the roof cap. There was no continuity, however, testing continuity through the roof cap found that there was continuity through the roof cap on both positive and negative sides. There was continuity on the positive wire from the controller under the solar panel to the quick disconnect. Therefore, I determine that the quick disconnected gone bad and did replace the entire cable from the inside of the control box feeding it back through the packing that clamping a connector on MONIQUE SCHONROCK, LORIE Customer #: 61954 the end, securing it to the control box inside, connecting the roof cap back to the quick disconnect and checking power through the roof cap and found that I had power through the roof cap Reconnected the roof cap to the wire harness, using crimp wire nuts, screwed the roof cap back to the roof resealed it with decor set the solar panel in place reattach it to the roof with three screws at each of the mounting brackets, resealed the mounting brackets with decor Tested power at the control box before reconnecting the wires of the control box that have 20 DC volts coming into the controller reconnected the controller and immediately showed that it was powering and charging the battery as it should be solar controller is now working correctly. 1.00HRS
matched • confidence 0.84
complaint
SFD NEW TT & INSTALL BATTERY - 1.5
needs-review • confidence 0.13
cause
Sfd delivery
needs-review • confidence 0.00
correction
Complete
needs-review • confidence 0.00
Evidence Thread
Stephanie Kendziorski
processor • Jul 21, 2026, 2:30 PM
Submitted PA 2750505
Stephanie Kendziorski
processor • Jul 22, 2026, 2:03 PM
Submitted for payment
Stephanie Kendziorski
processor • Jul 28, 2026, 12:10 PM
Paid $237.64 check 3199947 7/28/2026
Claim Files
73738F.pdf
main-pdf • Jul 22, 2026, 12:01 PM • 318,988 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/7- Claims in Process/7.1- Claims Submitted- iCS/Prime Time/73738/73738F.pdf
73738.pdf
main-pdf • Jul 21, 2026, 12:54 PM • 318,701 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/7- Claims in Process/7.1- Claims Submitted- iCS/Prime Time/73738/73738.pdf