iClaims logo
Internal operations platform

Claim Detail

Search result → immediate full claim view.
Home
Claim explorer / evidence thread
Claim 73412
MYRV 12024 • Stephanie • Approved / Unpaid • prime-time
Next Recommended Action

Await OEM Response

Approaching deadline
Reason
No flagged violation label yet — keep reviewing payment and document evidence
Deadline
Approaching deadline
Estimated recovery
$2,500.00
risk 0.00 deadline Approaching deadline images 0 matched 3 review 40

Warranty deadline timeline

Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
78d elapsed • 0d remaining
Analyzed
Completed stage
78d elapsed • 0d remaining
Awaiting OEM
Completed stage
78d elapsed • 0d remaining
Auto-Approved
Approaching deadline
78d elapsed • 0d remaining
Payment Due
Upcoming statutory deadline
78d elapsed • 0d remaining
Escalation Eligible
Upcoming statutory deadline
78d elapsed • 0d remaining
Resolved
Upcoming statutory deadline
78d elapsed • 0d remaining

AI Claim Analysis

Estimated Recovery Amount
$2,500.00
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
1
No flagged violation label yet — keep reviewing payment and document evidence
Missing Items
40
No active evidence gaps are listed.
Deadline Status
Approaching deadline
78 days open in the visible workflow.
Recommended Action
Await OEM Response
This is the fastest next move from the current workflow stage.

US dispute readiness

Evidence packet check

Full evidence packet
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
31
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Full evidence packet
Estimated packet is large. Prepare a concise executive chronology with full backup evidence separated.
Chronology
Ready to order
Visible span: Jun 16, 2026, 2:54 AM to Aug 26, 2026, 3:08 AM.
Indexed evidence
5 docs / 24 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
78 days open in the visible workflow; risk score 0.00.

Claim Summary

Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/MYRV 12024/5- Pre-Authorizations Approved- MYRV/Prime Time/73412/Approved PA - with notes from SK.pdf
Timeline
First seen Jun 16, 2026, 2:54 AM • last seen Aug 26, 2026, 3:08 AM
Evidence flags
No active evidence gap flags

Comment Intelligence

Thread depth
23 indexed side comments on this claim.
Latest visible thread signal
Aug 19, 2026, 12:15 PM • processor • @Brian P @Jeff M - Labor lines 1, 5 and 8 on this PA have notes in red from me. This is the final approved labor amounts. Reasons for reduced time is highlighted in yellow. Please let me know if there is anything you wan
Role mix
Dealer 0 • OEM 0 • Processor 16
Decision cues
Denial signals 4 • info / missing-doc asks 55 • approval signals 81
Best move
Work missing-doc or reply asks first from the thread.

Quick Actions

Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.

Claim Lines

complaint
UNDERBELLY COMPLETELY MISSING
needs-review • confidence 0.05
cause
Torn off during transport INC., MYERS "RV" CENTER, Customer #: 1000
needs-review • confidence 0.05
correction
Will need the full length of the trailer for a new bottom board will have to go along and remove all self tapping screws from front to back. We have to remove what bottom board is still attached to any of the sewer drops for great tanks and black tanks. Well have to pull all the foam away from all the sewer drops and freshwater drop drains. Will have to go along all electric lines resecure electric lines up some waterlines that are sagging will have to be resecured. This will be done using zip ties to secure the lines back up in place not interfering with the installation of the new bottom board. New bottom board will have to be installed reattached with self tapping screws with washers, cut outs for all the drains freshwater drain and low point drains once a bottom board has been completely reinstalled. Any cut out in the bottom board for dreams. Any electric will have to be sealed with foam. Requesting 16 hours to complete this job
needs-review • confidence 0.11
complaint
GRAY TANK HANDLES MISSING
needs-review • confidence 0.05
cause
Completely missing
needs-review • confidence 0.05
correction
Need to replace both front and rear gray tank handles. Found them to be completely missing. One will need an extension rod with the handle the other, just the bull handle. Request .15 hours
needs-review • confidence 0.05
complaint
BELT RAIL COMING IT OFF. Page 1 of 7 © 2026 Integrated Dealer Systems *73412*
partial-match • confidence 0.40
cause
Staples came loose not enough screws Promised Date: 15 JUN 26 W/O: 73412
partial-match • confidence 0.48
correction
We have to scrape clean and remove all silicone on the belt rail for the main slide on the passenger side. The slide will be the one that contains a refrigerator and dinette. Well have to measure and put the screws through the belt rail to reattach to the side of the unit and equal increments from the slide room to the rear of the unit. Will request one hour
needs-review • confidence 0.30
complaint
INNER SEAL FALLING OFF
partial-match • confidence 0.40
cause
Inner seal falling out not long enough or secured properly
partial-match • confidence 0.40
correction
Will need to remove the inner seal for the compartment door and replace inner seal with a seal that is longer in order for it to stay up in the corners. Second recommendation would be to completely replace the compartment door. Will request 30 minutes
partial-match • confidence 0.46
complaint
spring hanger bent INC., MYERS "RV" CENTER, Customer #: 1000
needs-review • confidence 0.33
cause
Unknown cause some object struck the axle and bent the spring hanger during transport
partial-match • confidence 0.38
correction
Recommendation remove front axle completely and replace with a new axle. Full inspection of the spring hanger check it for square straightness any stress fractures cracks in the steel. Potentially have to replace the spring hanger completely if it has any sort of damage besides being bent. Its a spring hanger can be straightened without causing further damage recommend straightening. Removal of the axle will require disconnecting it from the spring hanger and the rocker to the second axle, disconnecting the powerlines for the electric brakes pulling the axle out from underneath the unit, and of course, removing the tires hanging a new axle reconnecting the wires for the electric brakes voting it back into place and reinstalling the tires. Will request three hours to remove and replace and inspect the spring hanger
partial-match • confidence 0.45
complaint
Transferred to RV*73412-1 on 15 JUN 26 Estimate amount was 0.00 5TH WHEEL PRE PDI 4.0 HRS
needs-review • confidence 0.33
cause
Free PDI fifth wheel new unit
needs-review • confidence 0.28
correction
Pre-PDI complete 18 jobs added Notes for the jobs Master bedroom, barn door, master bathroom, barn door boat 24 x 74 Wraparound style door jam overall with 2 3/8 x 79 Cabinet door 17 x 26 right hand handle left hand hinge Cabinet base next to the refrigerator 14 1/2 x 78 1/2 two openings for two cabinet doors Page 2 of 7 © 2026 Integrated Dealer Systems *73412* Slight facia 5 1/2 x 79 1/2. Promised Date: 15 JUN 26 W/O: 73412 Linoleum size 47 x 105 Bottom board 63 wide by 40 feet
partial-match • confidence 0.46
complaint
WALL SEPARATION IN MASTER BEDRROOM *73412*
partial-match • confidence 0.49
cause
Interior wall separation from exterior wall
partial-match • confidence 0.58
correction
Recommendation full inspection to be conducted to ensure that there are no structural issues with the wall separation. This will require the removal of the panel. This will be at the entry door to the master bedroom on the passenger side will involve removing of all trim door jam for the barn door. The built-in cabinet at that wall, the top will have to be removed the cabinet disconnected from the exterior wall in order to get the panel completely off to remove the full sheet of paneling, it will be a light switch that will have to be removed for inspection of the joist between the exterior wall and the interior wall, possibly reattaching using screws. Reassembly of the built-in cabinet after installing the panel back in place putting the door jam back in place reinstalling the barn door reinstalling the light switch and putting back all trim putting any new and old staple holes. Well request six hours
matched • confidence 0.86
complaint
WALL SEPERATION ON OTHER SIDE OF THE BEDROOM.
partial-match • confidence 0.38
cause
Wall separation unknown structural damage
partial-match • confidence 0.51
correction
This will require the removal of all trim, electrical outlets, door, jam, removal of the panel, full inspection of the wall for the cause of the separation repairing replace any broken studs, possibly screwing the studs back to the wall if there is no broken material. Reinstalling the sheet of paneling, all trim door, jam, and electrical outlets. Will request three hours
matched • confidence 0.75
complaint
BATHROOM DOOR RIPPED OFF.
needs-review • confidence 0.32
cause
Roller on one side of the door ripped off completely tore off bottom door guide from the wall
partial-match • confidence 0.38
correction
Recommendation fully replace the door door size 24 x 74 barn door style. Recommendation replace the paneling behind the door, bottom door guide damage the paneling tearing large holes where it was attached. Those were require removal of all trim, barn door top guide removing the panel installing a new panel reinstalling all trim door, jam, and barn door. Also require new door in attaching all hardware to the new door, including travel latches rollers, reattaching the bottom door guide to the wall. Puttying any new and old, staple holes or nail holes. Will request three hours
matched • confidence 0.66
complaint
FURNITURE LOOSE.
needs-review • confidence 0.13
cause
Loose furniture, rubbing against the wall on the rear and exterior wall due to not having straps installed.
needs-review • confidence 0.26
correction
Recommendation completely replacing both panels on the end and on the long ways exterior wall require removal of two window, windows, window, blinds, window, trim, bat strips, any and all *73412* trim, cutting away silicone that seals edges against the ceiling, cleaning and removing all excessive silicone cutting new paneling to fit disconnecting and removing all electrical components from the walls light switches this board and 120 outlet installing new paneling, resealing edges with white silicone, cutting and covering all new staple holes or nail holes and any trim and on the paneling, reinstalling, both windows, both window blinds and window trim. We request eight hours
partial-match • confidence 0.35
complaint
REFRIGERATOR NOT IN PROPERLY
needs-review • confidence 0.00
cause
Refrigerator misaligned in the cabinet. INC., MYERS "RV" CENTER, Customer #: 1000
needs-review • confidence 0.15
correction
Recommend removing all brackets screws, holding the refrigerator in place realigning the refrigerator to match the cabinet verifying the doors operate correctly re-securing the refrigerator with secure brackets. Request one hour
needs-review • confidence 0.15
complaint
DOOR DAMAGED.
needs-review • confidence 0.28
cause
Large gouge on the inside of the bedroom door and chipped door jam
needs-review • confidence 0.28
correction
Recommend replacement of the door completely door size 24 x 74 barn door style. Will require removal of the damaged door all hardware removed from the door hardware reinstalled on the new door new door re-hung and adjusted. While the doors off removal and replacement of the door gym is wrapped around style door jam, 2 3/8 overall with by 79 inches and will require removal of the door jam cleaning up any nails or staples at pull through cutting the new door jam to fit with 45 angle at the top reattaching cutting new nails. Will request one .5 hours
partial-match • confidence 0.36
complaint
CABINET DOOR DAMAGED.
needs-review • confidence 0.32
cause
Gouge in the middle of the door, unknown object structure door
needs-review • confidence 0.32
correction
Recommend complete replacement of the door. Cabinet door size 17 x 26 handle on the right hinges on the left. Require removing the screws from the hinges taking the door off, attaching all the hardware to the new door reinstalling the door properly aligning it. Request 30 minutes of
needs-review • confidence 0.32
complaint
CHAIR HAS WHOLE TORN IN THE BACK.
needs-review • confidence 0.29
cause
Tear wrapped against another chair during delivery, rubbing a hole all the way through the back material
needs-review • confidence 0.29
correction
Recommend recommendation replacement of the chair completely
needs-review • confidence 0.29
complaint
COUCH IS NOT SECURED PROPERLY.
needs-review • confidence 0.32
cause
Unsecured couch piece rotating on the linoleum damage linoleum leaving a large mark in the linoleum.
partial-match • confidence 0.45
correction
Recommendation remove damage Leno replaced with new. This will require removing all couch components all base trim, cutting the Leno away from the wall edges. Cutting the new Leno to fit and installing it this will have to be glued down. Installing a bat strip along the entire perimeter at the floor to ensure no scenes can be seen visibly. Will request six hours
partial-match • confidence 0.54
complaint
CABINET CORNER DAMAGED.
needs-review • confidence 0.15
cause
Unsecured furniture struck the corner of the cabinet. Patient next to the refrigerator.
needs-review • confidence 0.15
correction
Recommendation replacing the entire cabinet face. Cabinet face was found to be assembled with wavy nails, preventing it to be taken apart and replacing the single piece of facia, the entire cabinet face will have to be removed and replaced. Just require removing both cabinet doors un screwing the cabinet face from the cabinet itself. Assembling the new cabinet face screwing it back into place to the cabinet reinstalling the cabinet doors. Requesting six hours
needs-review • confidence 0.20
complaint
DAMAGE TO SLIDE FACIA
needs-review • confidence 0.26
cause
Unknown object struck passenger side, kitchen, dinette slide, facia, closest to the front door chipping the corner.
needs-review • confidence 0.21
correction
Recommendation removal and replacement of the slide facia slide facia size 5 1/2 x 79 *73412* 1/2. This require praying the slight face off cleaning up any nails or staples and pulled through cutting the new facia to fit reattaching with Brad nails cutting any in all new staple or nail holes. Requesting 30 minutes
needs-review • confidence 0.11
complaint
washer and dryer closet wall separating
needs-review • confidence 0.33
cause
Unknown cause wall separating on both sides of the closet for the washer and dryer
needs-review • confidence 0.33
correction
Recommendation removal of the paneling on both sides inside the closet was required on one side, removing two electrical outlets, plumbing compartment for the for the washer, hook ups, removing all that strip, cutting away silicone and removing excess silicone after its been cut. Removing the paneling INC., MYERS "RV" CENTER, Customer #: 1000 conducting a full inspection of the structure to ensure nothing is broken inside. Potentially replacing studs inside the wall or screw the studs back to the exterior wall. Reinstalling the paneling, replacing all bat strips removed resealing joints with white silicone, putting any new nails or staple holes, reinstalling, electrical outlets, and plumbing compartment for the washing machine. Request six hours
partial-match • confidence 0.47
complaint
VENT LID IN BATHROOM BROKEN
partial-match • confidence 0.44
cause
Our event in the master bathroom, the lid will not open
needs-review • confidence 0.33
correction
Found that there is power to the motor into the fan However, when you press the button, you can hear the motor running with no movement on the lid Got on the roof verified there were no obstructions nothing holding the vent lid down Remove the screen on the inside, began observing the movements while another person press the button for the vent lid to open, I could see the mounting bracket for the motor in the gear to move. The lid up is bent outward, not allowing the two gears to make contact. This will require some disassembly, taking the gears off by taking the two set screws out removing the motor, straightening the metal reinstalling the motor and the gears and retesting The separation between the gears is the depth of the teeth on the gears Attached photos of the separation of the vent Will request 30 minutes
partial-match • confidence 0.49
complaint
COMPARTMENT DOOR WILL NOT LATCH.
needs-review • confidence 0.15
cause
Compartment, door driver side for the basement and water utility hook ups will not latch properly
needs-review • confidence 0.28
correction
Will require adjustment of the latch on the right side so that the door will properly latch and lock. Request 15 minutes
needs-review • confidence 0.15
complaint
SAFTEY STRAPS TO HOLD FURNITURE MISSING
needs-review • confidence 0.05
cause
Furniture straps missing completely FACTORY NEVER INSTALLED.
needs-review • confidence 0.05
correction
Recommend ordering straps to properly secure, dinette table, and chairs, couch pieces in the dinette area and the couch in the living area
needs-review • confidence 0.15

Evidence Thread

Jessica Lindaman
dealer_or_external • Jun 15, 2026, 1:05 PM
@Brian P
Stephanie Kendziorski
processor • Jun 15, 2026, 2:39 PM
@Brian P Job 2 - do you have any pics? Are jobs 8 and 11 the same? They appear to be for the same door. Job 18 - was anything found to be wrong with the vent? Why wouldn't it open? Tech is only asking for diag time. If so, I need to know what the repair is. What brand is the vent?
Stephanie Kendziorski
processor • Jun 15, 2026, 2:41 PM
@Brian P Job 2 - do you have any pics? Are jobs 8 and 11 the same? They appear to be for the same door. Job 18 - was anything found to be wrong with the vent? Why wouldn't it open? Tech is only asking for diag time. If so, I need to know what the repair is. What brand is the vent? Jobs 19 & 20 - Do you have pics?
Stephanie Kendziorski
processor • Jun 17, 2026, 11:56 AM
@Brian P Just a reminder, I still need above info.
Brian Parrott
dealer_or_external • Jun 18, 2026, 3:21 PM
I iwll be working on this one this afternoon
Stephanie Kendziorski
processor • Jun 23, 2026, 10:47 AM
Any update on this one?
Brian Parrott
dealer_or_external • Jun 23, 2026, 3:36 PM
We have redispatched for the info
Stephanie Kendziorski
processor • Jul 2, 2026, 2:18 PM
Just doing a check in on this one and letting you know I still need the info. No PA has been submitted at this time.
Stephanie Kendziorski
processor • Jul 21, 2026, 2:14 PM
Submitted PA 2710446
Stephanie Kendziorski
processor • Jul 22, 2026, 12:55 PM
Job 3 - need better pictures of this concern Job 4 - pending vendor Job 5 - Terran axle denied coverage, FR resubmitted to Lippert. Job 9 - Are these holes in the panels or just deep scrapes from the furniture moving while under transport? FR wants it split into two lines, need to know how much labor for each wall. Job 12 - Can you get a closer picture? FR said it looks like a smudge. Job 13 - need picture of the complete chair and any/all tags Job 14 - need better pictures and they would like you to get a sublet estimate. Job 15 - need pictures of complete cabinet with doors open and closed. Job 18 - need pics of the tags Job 19 - need pictures ------- Job 1 - approved 3.0 - very excessive labor requested, reduced to a reasonable amount to replace underbelly. Job 2 - approved .05 - excessive labor requested Job 6 - approved .4 - excessive labor requested - authorized to scrape loose seal from where interior wall meets sidewall paneling and reseal to fill gap. Job 7- approved .5 - excessive labor requested, authorized to scrape loose seal and gapped corners and edges and reseal to fill gap. Job 8 - approved .8 - Note from FR: flat rate to replace barn door damages when roller brackets tore out of door. No wall panel damages shown/lower door guide not mentioned. Job 10 - approved .5 - excessive labor requested Job 11 approved .8 Job 16 - approved .5 Job 17 - approved .6 - to repair only, scrape seal and reseal. Job 20 - approved .3
Stephanie Kendziorski
processor • Jul 22, 2026, 1:00 PM
@Brian P Job 3 - need better pictures of this concern Job 4 - pending vendor Job 5 - Terran axle denied coverage, FR resubmitted to Lippert. Job 9 - Are these holes in the panels or just deep scrapes from the furniture moving while under transport? FR wants it split into two lines, need to know how much labor for each wall. Job 12 - Can you get a closer picture? FR said it looks like a smudge. Job 13 - need picture of the complete chair and any/all tags Job 14 - need better pictures and they would like you to get a sublet estimate. Job 15 - need pictures of complete cabinet with doors open and closed. Job 18 - need pics of the tags Job 19 - need pictures ------- Job 1 - approved 3.0 - very excessive labor requested, reduced to a reasonable amount to replace underbelly. Job 2 - approved .05 - excessive labor requested Job 6 - approved .4 - excessive labor requested - authorized to scrape loose seal from where interior wall meets sidewall paneling and reseal to fill gap. Job 7- approved .5 - excessive labor requested, authorized to scrape loose seal and gapped corners and edges and reseal to fill gap. Job 8 - approved .8 - Note from FR: flat rate to replace barn door damages when roller brackets tore out of door. No wall panel damages shown/lower door guide not mentioned. Job 10 - approved .5 - excessive labor requested Job 11 approved .8 Job 16 - approved .5 Job 17 - approved .6 - to repair only, scrape seal and reseal. Job 20 - approved .3
Stephanie Kendziorski
processor • Jul 22, 2026, 2:00 PM
@Brian P Job 3 - need better pictures of this concern Job 4 - need pictures of tag on compartment door. Job 5 - Terran axle denied coverage, FR resubmitted to Lippert. Job 9 - Are these holes in the panels or just deep scrapes from the furniture moving while under transport? FR wants it split into two lines, need to know how much labor for each wall. Job 12 - Can you get a closer picture? FR said it looks like a smudge. Job 13 - need picture of the complete chair and any/all tags Job 14 - need better pictures and they would like you to get a sublet estimate. Job 15 - need pictures of complete cabinet with doors open and closed. Job 18 - need pics of the tags Job 19 - need pictures ------- Job 1 - approved 3.0 - very excessive labor requested, reduced to a reasonable amount to replace underbelly. Job 2 - approved .05 - excessive labor requested Job 6 - approved .4 - excessive labor requested - authorized to scrape loose seal from where interior wall meets sidewall paneling and reseal to fill gap. Job 7- approved .5 - excessive labor requested, authorized to scrape loose seal and gapped corners and edges and reseal to fill gap. Job 8 - approved .8 - Note from FR: flat rate to replace barn door damages when roller brackets tore out of door. No wall panel damages shown/lower door guide not mentioned. Job 10 - approved .5 - excessive labor requested Job 11 approved .8 Job 16 - approved .5 Job 17 - approved .6 - to repair only, scrape seal and reseal. Job 20 - approved .3
Stephanie Kendziorski
processor • Jul 22, 2026, 2:01 PM
@Brian P Emailed Chris Fendt at FR letting him know the unit came in damaged this way and rep assured Jeff repairs would be covered. Will keep you posted. New info added for line 4 - vendor would like pics of compartment door tag.
Sarah Caffrey
dealer_or_external • Jul 29, 2026, 1:46 PM
@Jeff M Brian - the last response on this thread was 6/23 from you. What is the status?
Brian Parrott
dealer_or_external • Jul 29, 2026, 2:17 PM
I have been in contact with Stephanie through email I was just working on this workorder. TIm needs two more pics then I will send back to her.
Stephanie Kendziorski
processor • Aug 9, 2026, 7:58 PM
@Brian P @Ashlee O For job 18, the vendor has stated that if you carefully squeeze the operator and the L bracket together it should fix the issue. Please have the tech attempt and let me know if that fixes the concern.
Stephanie Kendziorski
processor • Aug 17, 2026, 11:27 AM
@Brian P Still waiting to hear on the vent lid, Dennis Plank at FR sent a final request to the vendor today. I think you were CC'd on that email. Here is what we have for the remaining lines though. Let me know which lines you want me to push more on. Job 1 was significantly reduced and all of the wall separation jobs were only authorized to scrape old seal and then reseal. Approval from the portal is attached as well. Job 1 approved 3.0 - note from Chris Fendt at FR - Very excessive labor requested. Reduced to a reasonable amount to replace underbelly Job 2 - approved .05 - note from CF at FR - Excessive labor requested to replace missing T-handles and 1 extension rod for termination gate valves Job 3 approved .75 - note from CF at FR - Excessive labor requested. Reduced to a reasonable amount. Job 4 - approved .3 - vendor only authorized .3 Job 5 - approved 1.0 - Lippert only approved 1.0 to touch up dings and paint in axles as transportation damage. Terran axle denied warranty coverage due to object being hit while transporting, it is not a defect. Job 6 - approved .4 - excessive labor - scrape loose seal where interior wall meets sidewall paneling and reseal to fill gap. Job 7 - approved .5 - excessive labor - scrape loose seal from gapped corners and edges and reseal to fill gap. Job 8 - approved .8 - note from CF at FR - authed for flat rate to replace barn door damages when roller brackets tore out of door. No wall panel damages shown. Low door guide not mentioned. Job 9 - approved .5 Job 10 approved .5 - note from CF at FR - excessive labor requested to loosen, repositioned and resecure refer so it is even in the cabinet opening. Reduced to a reasonable amount. Job 11 - approved .8 Job 12 - approved .4 - note from CF at FR - authed for flat rate to replace damaged cabinet door. Job 13 - approved .1 - note from CF at FR - reduced to a reasonable amount Job 14 - approved .75 Job 15 - approved 2.5 - note from CF at FR - Excessive labor requested. Reduced to a reasonable amount to replace this face front, right of the refer. Remove refer from opening, remove door hinges, detach shelves and attach new front and reassemble. Reduced to a reasonable amount . Job 16 - approved .5 Job 17 - approved .6 - note from CF at FR - Excessive labor requested. Reduced to a reasonable amount to scrape old gapped seal from corners and reseal corners to conceal gaps. Job 18 - pending VCB Job 19 - approved .2 Job 20 - approved .3
Brian Parrott
dealer_or_external • Aug 17, 2026, 11:50 AM
Hey Stephanie when you get a chance on this one.
Stephanie Kendziorski
processor • Aug 18, 2026, 11:06 AM
Hey Brian. Can you let me know if this worked? If it will properly correct the concern, we may not need the additional photos they asked for.
Brian Parrott
dealer_or_external • Aug 18, 2026, 11:12 AM
We have not tried it yet, but I do think it will work.
Stephanie Kendziorski
processor • Aug 18, 2026, 1:14 PM
Ok, I'll let them know that the repair they suggested should work and see if we can get it approved without those additional pics.
Stephanie Kendziorski
processor • Aug 19, 2026, 12:11 PM
@Brian P All of the lines are approved at this time, but I still have some questions/concerns about lines 1, 5, and 11. I've attached a copy of the PA from the portal here in DB that has the reasons the labor was reduced highlighted, and then notes from me in red. I figured it might be easier than trying to read this little comment box. As previously mentioned, all the wall separation issues were reduced to just scraping the old seal and filling in the gap. Please call me if you have any additional questions or need me to further address any of these lines. Job 1 - approved 6.0 hours Job 2 - approved .05 Job 3 approved .75 Job 4 approved .3 Job 5 - approved 3.0 - to replace both axles Job 6 - approved .4 - to reseal only Job 7 - approved .5 - to reseal only Job 9 approved .5 Job 10 approved .5 Job 11 approved .8 - see my note on the PA about this line, included here in DB Job 12 approved .4 Job 13 approved .1 Job 14 approved .75 Job 15 approved 2.5 Job 16 approved .5 Job 17 approved .6 - to reseal only Job 18 approved .5 - to repair only Job 19 approved .2 Job 20 approved .3
Stephanie Kendziorski
processor • Aug 19, 2026, 12:15 PM
@Brian P @Jeff M - Labor lines 1, 5 and 8 on this PA have notes in red from me. This is the final approved labor amounts. Reasons for reduced time is highlighted in yellow. Please let me know if there is anything you want me to further address. As mentioned, the authorization for two axles is concerning to me when only one seems to need replacing.

Claim Files

Approved PA - with notes from SK.pdf
pdf • Aug 19, 2026, 12:07 PM • 144,793 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/5- Pre-Authorizations Approved- MYRV/Prime Time/73412/Approved PA - with notes from SK.pdf
73412 REVISED.pdf
pdf • Aug 4, 2026, 1:57 PM • 457,211 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/2-Pre-Authorizations Pending- iCS/Prime Time/73412/73412 REVISED.pdf
73412R.pdf
main-pdf • Jul 21, 2026, 2:09 PM • 335,123 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/2-Pre-Authorizations Pending- iCS/Prime Time/73412/73412R.pdf
73412R.pdf
main-pdf • Jul 21, 2026, 2:09 PM • 335,123 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/3- Pre-Authorizations Information Needed- iCS-MYRV/Prime Time/73412/73412R.pdf
73412.pdf
main-pdf • Jun 15, 2026, 1:04 PM • 419,406 bytes
/home/openclaw/nas/Dropbox/#recycle/MYRV 12024/1- Pre-Authorizations Needed- iCS/Prime Time/73412/73412.pdf