Claim explorer / evidence thread
Claim 72768-1
MYRV 12024 • Stephanie • Paid • prime-time
risk 0.00
deadline Overdue / escalation ready
images 0
matched 0
review 25
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
118d elapsed • 0d remaining
Analyzed
Completed stage
118d elapsed • 0d remaining
Awaiting OEM
Completed stage
118d elapsed • 0d remaining
Auto-Approved
Completed stage
118d elapsed • 0d remaining
Payment Due
Completed stage
118d elapsed • 0d remaining
Escalation Eligible
Completed stage
118d elapsed • 0d remaining
Resolved
Overdue / escalation ready
118d elapsed • 0d remaining • Overdue
AI Claim Analysis
Estimated Recovery Amount
$1,375.00
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
25
No active evidence gaps are listed.
Deadline Status
Overdue / escalation ready
118 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
23
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: May 7, 2026, 5:36 AM to Jun 25, 2026, 2:54 AM.
Indexed evidence
4 docs / 24 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
118 days open in the visible workflow; risk score 0.00.
Claim Summary
Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/MYRV 12024/8- Claims Paid/March 2026/PrimeTime/72768-1/Paid claim.pdf
Timeline
First seen May 7, 2026, 5:36 AM • last seen Jun 25, 2026, 2:54 AM
Evidence flags
No active evidence gap flags
Comment Intelligence
Thread depth
8 indexed side comments on this claim.
Latest visible thread signal
Mar 3, 2026, 12:33 PM • processor • Claim 2566700 paid $1105.48 check 3117578 3/3/2026
Role mix
Dealer 0 • OEM 0 • Processor 5
Decision cues
Denial signals 0 • info / missing-doc asks 2 • approval signals 12
Best move
Work missing-doc or reply asks first from the thread.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
Claim Lines
complaint
Entertainment Center, Hideaway door pulled from door jam
partial-match • confidence 0.36
cause
Pantry door came loose on hinge side falling and scraping the shelves inside INC., MYERS "RV" CENTER, Customer #: 1000
partial-match • confidence 0.58
correction
TV, fireplace, door, and plastic door jam had to be removed along with panels on each side, found the support on backer for the door and hinges was not enough to support the door. Added new stud and screwed into place. Reattached paneling on both sides, reinstalled plastic door jam, reinstalled door and tested for proper operation. The door now opens and closed properly. Reinstalled the fireplace and TV. Touched up all nicks and scratches, verified the latch was working. Reattached power cable with a zip tie. Time 1 hour
partial-match • confidence 0.36
complaint
Bedroom pocket door pulled from ceiling
needs-review • confidence 0.31
cause
Found door was not secure during transport, hit the wall scratching the door and causing minor damage to the wall. Barn door rail loose causing nicks and scratches to the wall and door
partial-match • confidence 0.55
correction
Found screws loose on top rail of the barn door. Tightened screws and added 4 additional screws. Checked operation of door is now working correctly and rail is secure Found a screw hole in the barn door rail trim. Used putty stick to fill the crack in the wall and the screw hole Used touch up stain on the scratch on door. Work completed Time 1 hour
partial-match • confidence 0.55
complaint
Seam tape at kitchen wall peeling at two separate areas
needs-review • confidence 0.29
cause
Seam tape behind kitchen sink pealing
needs-review • confidence 0.24
correction
Seam tape behind kitchen sink has been replaced. Removed, cleaned and replaced seam tape. Time .5 hours
needs-review • confidence 0.24
complaint
Center Batin strip wallpapers peeling in dinette slide room
needs-review • confidence 0.23
cause
Wall paper coming off batten trim
needs-review • confidence 0.27
correction
Removed batten trim Replaced with new trim .10 hours
needs-review • confidence 0.23
complaint
Wallpaper cut crooked at forward dinette slide wall
needs-review • confidence 0.32
cause
Gap in wallpaper at batten trim
partial-match • confidence 0.50
correction
Siliconed the edges between batten and wall Time .10 hours
needs-review • confidence 0.32
complaint
Excessive wood putty, and construction stain on walls, ceilings, and cabinet doors
partial-match • confidence 0.42
cause
Excessive putty and missing putty glue and silicone on the walls and ceiling
needs-review • confidence 0.31
correction
Found excessive putty on the ceiling and walls throughout the unit Found in the front bedroom there was adhesive on the ceiling and wall Found silicone on the wall above the passenger slide Wiped down all excessive putty from the walls and ceiling Filled the staple holes that were missing putty Scrubbed the adhesive off the ceiling and wall in the bedroom Scrubbed the black marks off the ceiling in hallway and Main room Work completed Page 2 of 5 © 2026 Integrated Dealer Systems *72768-1* Time 1 hour Promised Date: 26 FEB 26 W/O: 72768-1
partial-match • confidence 0.53
complaint
Missing red battery disconnect key
needs-review • confidence 0.05
cause
Battery disconnect red key is missing
needs-review • confidence 0.05
correction
Disconnect key missing need to order new one *72768-1* Hold for
needs-review • confidence 0.07
complaint
Water leak
needs-review • confidence 0.27
cause
Water leak cold water line
needs-review • confidence 0.27
correction
Line repaired unit has been winterized will need to verify and leak test during SFD Time .30
needs-review • confidence 0.23
complaint
Anti-siphon valve and access panel under bathroom sink
needs-review • confidence 0.33
cause
Anti-siphon valve for black tank flush malfunctioning *1000*
needs-review • confidence 0.26
correction
Found the anti-siphon valve under the bathroom sink was not working correctly. Disconnected the zip tie holding the anti-siphon valve. Removed the valve and installed new one. Work completed Time 45 minutes
needs-review • confidence 0.26
complaint
Panel under batroom sink
needs-review • confidence 0.34
cause
The access panel under bathroom sink had come apart.
needs-review • confidence 0.34
correction
Removed the base for the access panel Pulled all the old staples Re-stapled the base to the panel and installed the access panel Work complete
needs-review • confidence 0.34
complaint
Cracked caulking around counter top
needs-review • confidence 0.25
cause
Cracked caulking counter top edge at kitchen sink
needs-review • confidence 0.29
correction
Removed the cracked caulking on the counter top. Cleaned and reapplied with white silicone Work complete. Time .30
needs-review • confidence 0.25
complaint
Medicine cabinet doors not aligned
partial-match • confidence 0.40
cause
Medicine cabinet doors too close together and hitting each other
partial-match • confidence 0.40
correction
Moved the right cabinet door 1/8 inch to the right by removing the hinge screws the reattaching the door ensuring the doors were even Moved the door catch over on the left an 1/8 inch. Doors now aligned and work correctly Work completed Time 30 minutes *1000*
partial-match • confidence 0.63
Evidence Thread
Jeannette Britton
dealer_or_external • Jan 30, 2026, 2:40 PM
@Stephanie K FYI...We do have parts billed out on this. It is completed also. i have not finalized it since I have not entered the tech's time.
Stephanie Kendziorski
processor • Jan 30, 2026, 3:32 PM
Submitted PA 2566700 - @Jeannette B Just a heads up on this that the anti-siphon vent will need to be returned. This is a new policy - the vendor wants to do some research on it to figure out the root cause of failure. Just wanted to let you know so it does not get discarded.
Jeannette Britton
dealer_or_external • Jan 31, 2026, 3:01 PM
@Stephanie K I kept it. Once I receive approval times I will finalize WO, print the return label and send it to you.
Stephanie Kendziorski
processor • Feb 3, 2026, 9:32 AM
Job 1 approved 1.0
Job 2 approved 1.0
Job 3 approved .5
Job 4 approved .2
Job 5 approved .1
Job 6 approved 1.0
Job 7 approved .25
Job 9 approved .3
Job 10 - not yet approved
Job 11 - approved .2
Job 12 approved .3
Stephanie Kendziorski
processor • Feb 5, 2026, 5:31 PM
Job 10 is now approved for .5 (.3 for the valve and .2 for the panel, FR requested they be separate jobs for claiming, so if you want to make job 10A, you can)
Jeannette Britton
dealer_or_external • Feb 6, 2026, 9:42 AM
@Stephanie K Awesome. Thank you and I did put the panel as 10A
Stephanie Kendziorski
processor • Feb 24, 2026, 2:43 PM
Submitted for payment
Stephanie Kendziorski
processor • Mar 3, 2026, 12:33 PM
Claim 2566700 paid $1105.48 check 3117578 3/3/2026
Claim Files
Paid claim.pdf
pdf • Mar 3, 2026, 12:33 PM • 46,097 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/8- Claims Paid/March 2026/PrimeTime/72768-1/Paid claim.pdf
Invoice.pdf
main-pdf • Feb 24, 2026, 2:31 PM • 60,451 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/8- Claims Paid/March 2026/PrimeTime/72768-1/Invoice.pdf
72768-1F.pdf
main-pdf • Feb 24, 2026, 1:23 PM • 337,432 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/8- Claims Paid/March 2026/PrimeTime/72768-1/72768-1F.pdf
72768-1.pdf
main-pdf • Jan 30, 2026, 2:33 PM • 333,227 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/8- Claims Paid/March 2026/PrimeTime/72768-1/72768-1.pdf