iClaims logo
Internal operations platform

Claim Detail

Search result → immediate full claim view.
Home
Claim explorer / evidence thread
Claim 40772
LIN 1025 • Alix • Paid • forest-river
Next Recommended Action

Escalate to State

Payment deadline violated
Reason
OEM Response Deadline Exceeded
Deadline
Payment deadline violated
Estimated recovery
Pending payment match
risk 0.00 deadline Overdue / escalation ready images 0 matched 0 review 9

Warranty deadline timeline

Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
90d elapsed • 0d remaining
Analyzed
Completed stage
90d elapsed • 0d remaining
Awaiting OEM
Completed stage
90d elapsed • 0d remaining
Auto-Approved
Completed stage
90d elapsed • 0d remaining
Payment Due
Completed stage
90d elapsed • 0d remaining
Escalation Eligible
Completed stage
90d elapsed • 0d remaining
Resolved
Overdue / escalation ready
90d elapsed • 0d remaining • Overdue

AI Claim Analysis

Estimated Recovery Amount
Pending payment match
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
9
No active evidence gaps are listed.
Deadline Status
Overdue / escalation ready
90 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.

US dispute readiness

Evidence packet check

Full evidence packet
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
32
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Full evidence packet
Estimated packet is large. Prepare a concise executive chronology with full backup evidence separated.
Chronology
Ready to order
Visible span: Jun 3, 2026, 2:44 PM to Jun 20, 2026, 2:56 AM.
Indexed evidence
16 docs / 24 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
90 days open in the visible workflow; risk score 0.00.

Claim Summary

Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/LIN 1025/8-Claims Paid/40772/Claim Sheet.pdf
Timeline
First seen Jun 3, 2026, 2:44 PM • last seen Jun 20, 2026, 2:56 AM
Evidence flags
No active evidence gap flags

Comment Intelligence

Thread depth
7 indexed side comments on this claim.
Latest visible thread signal
Jun 12, 2026, 10:12 AM • processor • @cody e @Jeremy G @BONNIE S This paid on check 3174266 for $132 total Job B: labor - $49.50 Job C: labor - $82.50
Role mix
Dealer 0 • OEM 0 • Processor 7
Decision cues
Denial signals 2 • info / missing-doc asks 0 • approval signals 5
Best move
Escalation / denial review should happen before more packet browsing.

Quick Actions

Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.

Claim Lines

complaint
Customer states when they run water, the shower basin filled up.
needs-review • confidence 0.08
cause
Removed drain screen from shower to check for obstruction, found nothing. Grey tank was empty, ran kitchen sink, bathroom sink, and shower until grey tank was full, the shower basin did not fill up.
needs-review • confidence 0.12
correction
Shower drains as it should based of testing/diagnosing. Dumped grey tank since it filled while testing. Model# Dlr Sub Hrs 1.00 Sub
needs-review • confidence 0.08
complaint
Customer states the shower head has very low water pressure.
needs-review • confidence 0.09
cause
Debris in showerhead
needs-review • confidence 0.03
correction
Took shower head off, cleaned a little bit of debris out of screen, put back on and tested. Pressure seems normal, there is a small rubber "o" ring in there that could be removed. I tried it both ways, seems like it was about the same with or without the O ring in there. Left it in place. Model# Dlr Sub Hrs 0.40 Sub
needs-review • confidence 0.17
complaint
Customer states the hot and cold shower handles are reversed.
needs-review • confidence 0.08
cause
Installed incorrectly.
needs-review • confidence 0.00
correction
Hot was on the right and cold was on the left, swapped handles. Tested and hot works for hot and cold works for cold. Added before and after photos. Model# Dlr Sub Hrs 0.50 Sub
needs-review • confidence 0.06

Evidence Thread

Alix Mongiat
processor • Jun 3, 2026, 1:03 PM
PA 2697432 has been submitted for approval. This is ready to submit once approved.
Alix Mongiat
processor • Jun 3, 2026, 2:51 PM
@cody e @Jeremy G Job A: denied, this is not a warranty issue. There was no issue, there was no correction. This is not covered under warranty. Denied, Forest River respectfully denies warranty and goodwill participation in this repair to this unit. Job B: approved for 0.3 hour (requested 0.4 hour)The time requested is excessive for this repair, time adjusted. NVCB .30 to clean the debris from the shower head. Job C: approved for 0.1 hour (requested 0.5 hour) The time requested is excessive for this repair, time adjusted. The knobs did not be removed to switch. NVCB .10 to switch the popout hot and cold inserts for the shower faucet handles.
Alix Mongiat
processor • Jun 3, 2026, 2:52 PM
Moving to ready to submit.
Alix Mongiat
processor • Jun 3, 2026, 4:51 PM
I have reached out to Dennis at Forest River to review labor line 3 again and requested the full 0.5 hour be approved.
Alix Mongiat
processor • Jun 4, 2026, 2:25 PM
@cody e @Jeremy G Job C has now been approved for 0.5 hour.
Alix Mongiat
processor • Jun 4, 2026, 2:29 PM
This has been submitted for payment.
Alix Mongiat
processor • Jun 12, 2026, 10:12 AM
@cody e @Jeremy G @BONNIE S This paid on check 3174266 for $132 total Job B: labor - $49.50 Job C: labor - $82.50

Claim Files

Claim Sheet.pdf
pdf • Jun 12, 2026, 10:12 AM • 26,911 bytes
/home/openclaw/nas/Dropbox/LIN 1025/8-Claims Paid/40772/Claim Sheet.pdf
RO# 40772 media.zip
zip • Jun 3, 2026, 12:54 PM • 37,232,807 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/7- Claims in Process/7.1- Claims Submitted- iCS/Forest River/40772/RO# 40772 media.zip
RO# 40772 media.zip
zip • Jun 3, 2026, 12:54 PM • 37,232,807 bytes
/home/openclaw/nas/Dropbox/LIN 1025/8-Claims Paid/40772/RO# 40772 media.zip
RO# 40772 media.zip
zip • Jun 3, 2026, 12:54 PM • 37,232,807 bytes
/home/openclaw/nas/Dropbox/LIN 1025/7- Claims in Process/7.1- Claims Submitted- iCS/Forest River/40772/RO# 40772 media.zip
RO# 40772 media.zip
zip • Jun 3, 2026, 12:54 PM • 37,232,807 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/6- Ready to Submit/Forest River/40772_2/RO# 40772 media.zip
RO# 40772 media.zip
zip • Jun 3, 2026, 12:54 PM • 37,232,807 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/2-Pre-Authorizations Pending-iCS/Forest River/40772/RO# 40772 media.zip
RO# 40772 media.zip
zip • Jun 3, 2026, 12:54 PM • 37,232,807 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/6- Ready to Submit/Forest River/40772_1/RO# 40772 media.zip
40772.pdf
main-pdf • Jun 3, 2026, 12:54 PM • 298,847 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/7- Claims in Process/7.1- Claims Submitted- iCS/Forest River/40772/40772.pdf
40772.pdf
main-pdf • Jun 3, 2026, 12:54 PM • 298,847 bytes
/home/openclaw/nas/Dropbox/LIN 1025/8-Claims Paid/40772/40772.pdf
40772.pdf
main-pdf • Jun 3, 2026, 12:54 PM • 298,847 bytes
/home/openclaw/nas/Dropbox/LIN 1025/7- Claims in Process/7.1- Claims Submitted- iCS/Forest River/40772/40772.pdf
40772.pdf
main-pdf • Jun 3, 2026, 12:54 PM • 298,847 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/6- Ready to Submit/Forest River/40772_2/40772.pdf
40772.pdf
main-pdf • Jun 3, 2026, 12:54 PM • 298,847 bytes
/home/openclaw/nas/Dropbox/LIN 1025/6- Ready to Submit/Forest River/40772/40772.pdf
40772.pdf
main-pdf • Jun 3, 2026, 12:54 PM • 298,847 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/2-Pre-Authorizations Pending-iCS/Forest River/40772/40772.pdf
40772.pdf
main-pdf • Jun 3, 2026, 12:54 PM • 298,847 bytes
/home/openclaw/nas/Dropbox/LIN 1025/2-Pre-Authorizations Pending-iCS/Forest River/40772/40772.pdf
40772.pdf
main-pdf • Jun 3, 2026, 12:54 PM • 298,847 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/6- Ready to Submit/Forest River/40772_1/40772.pdf
1780505627048_40772_INVOICE_ACCOUNTING_1_original.pdf
pdf • Jun 3, 2026, 12:54 PM • 298,847 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/6- Ready to Submit/Forest River/40772/1780505627048_40772_INVOICE_ACCOUNTING_1_original.pdf