Claim explorer / evidence thread
Claim 13300
GRE 8220 • Alix • Paid • forest-river
risk 0.35
deadline Overdue / escalation ready
images 28
matched 0
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
58d elapsed • 0d remaining
Analyzed
Completed stage
58d elapsed • 0d remaining
Awaiting OEM
Completed stage
58d elapsed • 0d remaining
Auto-Approved
Completed stage
58d elapsed • 0d remaining
Payment Due
Completed stage
58d elapsed • 0d remaining
Escalation Eligible
Completed stage
58d elapsed • 0d remaining
Resolved
Overdue / escalation ready
58d elapsed • 0d remaining • Overdue
AI Claim Analysis
Estimated Recovery Amount
$375.00
What this claim may still be worth based on current evidence.
Compliance Score
65/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
0
missing_unit_id_photo
Deadline Status
Overdue / escalation ready
58 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
26
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Condensed packet watch
Close to a bulky packet. Trim, paginate, and preflight before escalation.
Chronology
Ready to order
Visible span: May 7, 2026, 5:05 AM to Jun 20, 2026, 2:56 AM.
Indexed evidence
11 docs / 24 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Monitor
58 days open in the visible workflow; risk score 0.35.
Claim Summary
Evidence summary
images=28; damage=0; unit=0; parts=0; doc=21; gaps=missing_unit_id_photo • Unit 2017 Forest River • VIN 4X4TWDR21HM056390
Path
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/13300/Claim Sheet.pdf
Timeline
First seen May 7, 2026, 5:05 AM • last seen Jun 20, 2026, 2:56 AM
Evidence flags
missing unit id photo
Comment Intelligence
Thread depth
7 indexed side comments on this claim.
Latest visible thread signal
May 21, 2026, 10:16 AM • processor • This paid on check 3160613 for $28
Role mix
Dealer 0 • OEM 0 • Processor 6
Decision cues
Denial signals 0 • info / missing-doc asks 1 • approval signals 1
Best move
Work missing-doc or reply asks first from the thread.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
document-photo
Claim Lines
complaint
NHTSA RECALL: 25V682 DISTRIBUTION PANEL W 1021 FORES CONNECTED TO CONSTANT 12V HOT
partial-match • confidence 0.63
cause
pics taken before and after repairs i found that the distribution panel 12 volt wire and the break away wire was not protected
partial-match • confidence 0.63
correction
remove both wires from the constant 12 volt and switched them to the auxiliary side so they are now protected REQ: 1 HOUR OF LABOR
partial-match • confidence 0.71
Evidence Thread
Alix Mongiat
processor • May 1, 2026, 8:50 AM
PA 2661096 has been submitted for approval.
Alix Mongiat
processor • May 1, 2026, 1:15 PM
@Dustin L @Kaitlyn R This was approved for 0.2 hour per flat rate (requested 1 hour)
Alix Mongiat
processor • May 5, 2026, 9:40 AM
@Dustin L It looks like this work is already done according to the correction. Please move to Ready to submit if so.
Alix Mongiat
processor • May 5, 2026, 4:58 PM
@Dustin L Were any parts used or anything? I see a quantity of 1 by shop supplies. Need to know what this is and a price if so.
Dustin Lucas
dealer_or_external • May 5, 2026, 5:20 PM
@Alix M Shop supply is a charge on every service call this is a mobile work order.
Alix Mongiat
processor • May 6, 2026, 8:47 AM
This has been submitted for payment.
Alix Mongiat
processor • May 21, 2026, 10:16 AM
This paid on check 3160613 for $28
Claim Files
Claim Sheet.pdf
pdf • May 21, 2026, 10:17 AM • 21,836 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/13300/Claim Sheet.pdf
Claim Sheet.pdf
pdf • May 21, 2026, 10:17 AM • 21,836 bytes
/home/openclaw/nas/Dropbox/#recycle/GRE 8220/7- Claims in Process- iCS GRE/7.1- Claims Submitted- iCS/Forest River/13300/Claim Sheet.pdf
13300.pdf
main-pdf • Apr 30, 2026, 4:51 PM • 72,779 bytes
/home/openclaw/nas/Dropbox/GRE 8220/8- Claims Paid/13300/13300.pdf
13300.pdf
main-pdf • Apr 30, 2026, 4:51 PM • 72,779 bytes
/home/openclaw/nas/Dropbox/#recycle/GRE 8220/7- Claims in Process- iCS GRE/7.1- Claims Submitted- iCS/Forest River/13300/13300.pdf
13300.pdf
main-pdf • Apr 30, 2026, 4:51 PM • 72,779 bytes
/home/openclaw/nas/Dropbox/GRE 8220/7- Claims in Process- iCS GRE/7.1- Claims Submitted- iCS/Forest River/13300/13300.pdf
13300.pdf
main-pdf • Apr 30, 2026, 4:51 PM • 72,779 bytes
/home/openclaw/nas/Dropbox/#recycle/GRE 8220/5-Pre-Authorizations Approved- GRE/Forest River/13300/13300.pdf
13300.pdf
main-pdf • Apr 30, 2026, 4:51 PM • 72,779 bytes
/home/openclaw/nas/Dropbox/GRE 8220/5-Pre-Authorizations Approved- GRE/Forest River/13300/13300.pdf
13300.pdf
main-pdf • Apr 30, 2026, 4:51 PM • 72,779 bytes
/home/openclaw/nas/Dropbox/#recycle/GRE 8220/2-Pre-Authorizations Pending- iCS/Forest River/13300/13300.pdf
13300.pdf
main-pdf • Apr 30, 2026, 4:51 PM • 72,779 bytes
/home/openclaw/nas/Dropbox/#recycle/GRE 8220/1-Pre-Authorizations Needed- iCS/Forest River/13300_1/13300.pdf
13300.pdf
main-pdf • Apr 30, 2026, 4:51 PM • 72,779 bytes
/home/openclaw/nas/Dropbox/GRE 8220/1-Pre-Authorizations Needed- iCS/Forest River/13300/13300.pdf
13300.pdf
main-pdf • Apr 30, 2026, 4:51 PM • 72,779 bytes
/home/openclaw/nas/Dropbox/#recycle/GRE 8220/1-Pre-Authorizations Needed- iCS/Forest River/13300/13300/13300.pdf