iClaims logo
Internal operations platform

Claim Detail

Search result → immediate full claim view.
Home
Claim explorer / evidence thread
Claim 80245
BARV600 • Ashlee • Submitted • forest-river
Next Recommended Action

Review Short-Pay

Approaching deadline
Reason
OEM Response Deadline Exceeded
Deadline
Approaching deadline
Estimated recovery
$500.00
risk 0.00 deadline Approaching deadline images 0 matched 0 review 14

Warranty deadline timeline

Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
57d elapsed • 0d remaining
Analyzed
Completed stage
57d elapsed • 0d remaining
Awaiting OEM
Completed stage
57d elapsed • 0d remaining
Auto-Approved
Completed stage
57d elapsed • 0d remaining
Payment Due
Approaching deadline
57d elapsed • 0d remaining
Escalation Eligible
Upcoming statutory deadline
57d elapsed • 0d remaining
Resolved
Upcoming statutory deadline
57d elapsed • 0d remaining

AI Claim Analysis

Estimated Recovery Amount
$500.00
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
1
OEM Response Deadline Exceeded
Missing Items
14
No active evidence gaps are listed.
Deadline Status
Approaching deadline
57 days open in the visible workflow.
Recommended Action
Review Short-Pay
This is the fastest next move from the current workflow stage.

Dossier completeness

Dossier has not been generated yet. Evidence presence is not treated as complete.

US dispute readiness

Evidence packet check

Compact packet candidate
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
6
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: Sep 4, 2026, 11:42 AM to Sep 5, 2026, 2:55 AM.
Indexed evidence
2 docs / 0 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Monitor
57 days open in the visible workflow; risk score 0.00.

Claim Summary

Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/BARV600/Claims Submitted AO/FR sub BA-AO/80245/WO_80245_JOB_4_2026.08.27_16.01.11.jpeg
Timeline
First seen Sep 4, 2026, 11:42 AM • last seen Sep 5, 2026, 2:55 AM
Evidence flags
No active evidence gap flags

Comment Intelligence

Thread depth
2 indexed side comments on this claim.
Latest visible thread signal
Sep 16, 2026, 12:37 PM • processor • paid $289.89 9/15 check #3226391
Role mix
Dealer 0 • OEM 0 • Processor 2
Decision cues
Denial signals 0 • info / missing-doc asks 0 • approval signals 0
Best move
Open the focused thread before hunting through the packet manually.

Quick Actions

Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.

Images

Claim Lines

complaint
Transferred to BAS*80810 on 06 AUG 26 Estimate amount was 0.00 PDI- NEW TRAVEL TRAILER 3 HRS PDI
needs-review • confidence 0.33
cause
new pdi
needs-review • confidence 0.31
correction
brought unit in. removed Ip tank that was vaccum purged and filled one 20Ib Ip tank. aired all tires to 65psi torqued lugnuts to 110ftlbs. jacked up both sides of unit to check breaks. breaks engage [4 o but do not grab all the way. will have job writen. went to roof and inspected dicor. notied some void and [Z¥-3 cracks on non leveling and leveling dicor as well as some voids in silicone on outside. will have job writen a H for that. added decals to Ip tank and company decals. all clearnace lights and break lights work. Range Z3 works Ip. Water heater works on Ip. Ac unit works. Smoke detector and Ip detector work. Furance works on 2 * Ip. Microwave works. Watwr heater woeks at all water points. All windows and blinds works as they should. Fy All interior lights woek. Awning lights work. Awning fabric in good condition and runs in and out as it should. 2 g Leak so,where in shower job will be wrote for that. Range vent fan and light work. Compartment door locks o and fits propelry. Stero system works inside and outside speakers. Ran testing outlets. All outlets work r tripped gfci and it tripped and reset properly. Ran Ip test unit passed 50% test. Ran leak test at 8iwc for x Smins. Unit passed leak test. Tv did not have coax cable to so a cable was made for tv in unit. Place range =< back together and checked for leaks none found at range. Ran flood test on grey tank tank vsive holds —_ watwr back and sensors show fill rate properly. Fridge works. Ran flood test on black tank. Seanors work = properly showing tank levels and valve holds watwr back as it should. Front jaxk works. Stabilzer jacks = work. Filled fresh tank to 1/3 ran pump. Pump works at all water points and water heater works off pump. = Gate valves work when pulled and waster and watwr comes out of connextion. Sensors working properly = showing tanks empty. Water heater works on pump =
partial-match • confidence 0.51
complaint
BRAKES DONT GRAP AT ALL Fria EON ||| || I © 2026 Integrated Dealer Systems
needs-review • confidence 0.10
cause
Breka not grabbing =
needs-review • confidence 0.00
correction
During pdi noticed door side wheel breaks would not grab when turned on. Jacked unit up and adjusted breaks. Checked adjustment and to make sure breaks are grabbing. Tire is at 1.5 revolutions 1 and breaks now grab 2
needs-review • confidence 0.19
complaint
VOIDS IN SCRACKS AND SILICONE AND DICOR ~$ LN
needs-review • confidence 0.31
cause
Awning fabric \\ ) a
needs-review • confidence 0.31
correction
Brought unit in. Removed gutter spout and removed s re ys-for bric. Placed clip in — spring to stop from rolling. Removed screws in head to pull off arms. Pla on‘ground. Removed — fabric from tube. Placed new fabric on tube. Rolled fabric up and ransfabric t rough channel. Placed heads = in position and placed bolts in then tightened down. Ran awning i L to adjust fabric til in set position. —
needs-review • confidence 0.33
complaint
LEAK IN SHOWER? fk \& )
partial-match • confidence 0.46
cause
Shower leaki wi Fd
needs-review • confidence 0.33
correction
During pdiznoticed shower had a bad leaked;:Removed cover plate and tried to tighten > a drains. Shower still leskedb Tred to tighten more but could not reach without pulling shower pan. Was told i a H could remove pan. Removed all screws on clips around pan and cut siliocne. Removed screws holding pan. Zo Tried to tighten elbow. Still leaked. Removed anti siphon and elbow. Took apart checked seals. Seals are = oh good. Hand tightened together and they placed back in drain plumbing. Checked for leaks. None found. EN Placed all screws and trim pieces back. Siliconed around trim. 1] 8
partial-match • confidence 0.54
complaint
BOOSTER LIGHT DOES NOT COME ON —
needs-review • confidence 0.32
cause
Booster won't light up. ——
needs-review • confidence 0.32
correction
During pdi noticed booster would not turn on. Checked voltage. Wires have 13.5v checked continuity. Booster wires do not have continuity. There is a burn on the board of the booster.
needs-review • confidence 0.32
complaint
ENTRY DOOR IS BOWED NE
needs-review • confidence 0.33
cause
Entry door bowed
needs-review • confidence 0.33
correction
During pdi noticed the entry door had a bow in the bottom. Tired nding the door back but = door would not move back. Tired using blocks of wood to bow door back intd pla oarstifl would not — bend back and seal.
partial-match • confidence 0.55

Evidence Thread

Ashlee Olsen
processor • Sep 4, 2026, 2:47 PM
submitted C#2767054
Ashlee Olsen
processor • Sep 16, 2026, 12:37 PM
paid $289.89 9/15 check #3226391

Claim Files

CLAIM.pdf
main-pdf • Sep 4, 2026, 11:38 AM • 134,172 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims Submitted AO/FR sub BA-AO/80245/CLAIM.pdf
CLAIM.pdf
main-pdf • Sep 4, 2026, 11:38 AM • 134,172 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims to Process-AY/80245/CLAIM.pdf