Claim explorer / evidence thread
Claim 74787
BARV600 • Ashlee • Paid • alliance
risk 0.00
deadline Overdue / escalation ready
images 0
matched 0
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
145d elapsed • 0d remaining
Analyzed
Completed stage
145d elapsed • 0d remaining
Awaiting OEM
Completed stage
145d elapsed • 0d remaining
Auto-Approved
Completed stage
145d elapsed • 0d remaining
Payment Due
Completed stage
145d elapsed • 0d remaining
Escalation Eligible
Completed stage
145d elapsed • 0d remaining
Resolved
Overdue / escalation ready
145d elapsed • 0d remaining • Overdue
AI Claim Analysis
Estimated Recovery Amount
Pending payment match
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
0
No active evidence gaps are listed.
Deadline Status
Overdue / escalation ready
145 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.
Dossier completeness
Dossier has not been generated yet. Evidence presence is not treated as complete.
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
14
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: Jun 8, 2026, 7:49 PM to Jun 25, 2026, 2:54 AM.
Indexed evidence
3 docs / 20 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
145 days open in the visible workflow; risk score 0.00.
Claim Summary
Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/BARV600/Claims Paid AO/74787/CLAIM.pdf
Timeline
First seen Jun 8, 2026, 7:49 PM • last seen Jun 25, 2026, 2:54 AM
Evidence flags
No active evidence gap flags
Comment Intelligence
Thread depth
2 indexed side comments on this claim.
Latest visible thread signal
Oct 7, 2024, 3:15 PM • processor • paid $51.00
Role mix
Dealer 0 • OEM 0 • Processor 2
Decision cues
Denial signals 0 • info / missing-doc asks 0 • approval signals 0
Best move
Open the focused thread before hunting through the packet manually.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
document-photo
Photo shows a black GFCI-protected electrical receptacle installed beside a countertop.
Human interpretation • confidence 0.86
document-photo
Optional 3-year parts contract application for MACH 15 A/C.
Human interpretation • confidence 0.94
document-photo
Photo shows AC distribution enclosed panelboard, model WF-8930/50, with breaker labels.
Human interpretation • confidence 0.89
document-photo
Photo shows a Furrion 2.4 GPM tankless gas water heater identification label.
Human interpretation • confidence 0.86
document-photo
Open wall electrical box with exposed wiring and removed black panel.
Human interpretation • confidence 0.82
document-photo
Internal unit label and wiring shown; no visible damage.
Human interpretation • confidence 0.86
document-photo
Electrical control panel with fuse board and barcode label; no visible damage.
Human interpretation • confidence 0.82
document-photo
Equipment data plate and wiring diagram visible; no damage or failed part is shown.
Human interpretation • confidence 0.94
document-photo
Photo shows a black wall-mounted bracket or latch assembly being held against a textured panel.
Human interpretation • confidence 0.62
document-photo
Photo shows a black wall-mounted control panel beside a countertop.
Human interpretation • confidence 0.78
document-photo
Furrion warranty manual shown with FGR17G3A2-BG and serial 10001743416042400236.
Human interpretation • confidence 0.98
document-photo
Solera-labeled black roll assembly photographed; label shows 8/14/2024.
Human interpretation • confidence 0.84
document-photo
Manufacturer parts label on a black metal component; no visible damage.
Human interpretation • confidence 0.84
document-photo
Label documents an Alliance RV-PLT 3 awning roller assembly dated 8/14/2024.
Human interpretation • confidence 0.86
document-photo
Photo shows a Pentair SHURFLO 12V water pump installed with fittings and wiring.
Human interpretation • confidence 0.94
document-photo
Furrion 10 cu ft DC refrigerator label and interior hinge area shown.
Human interpretation • confidence 0.93
document-photo
Pentair Shurflo water pump installed beside solar charge controller.
Human interpretation • confidence 0.94
document-photo
Greystone GSMW09B microwave instruction manual shown; no damage or failed part visible.
Human interpretation • confidence 0.86
document-photo
Part label shows AMVI HI WHITE CP & OEM, part 31835, dated 19-Jun-2024.
Human interpretation • confidence 0.94
document-photo
Furrion Arctic 12V refrigerator documentation and packaged component shown.
Human interpretation • confidence 0.93
Claim Lines
No claim lines loaded
Evidence Thread
Ashlee Olsen
processor • Oct 4, 2024, 2:02 PM
submitted C#66283
Ashlee Olsen
processor • Oct 7, 2024, 3:15 PM
paid $51.00
Claim Files
CLAIM.pdf
main-pdf • Oct 4, 2024, 1:35 PM • 286,657 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims Paid AO/74787/CLAIM.pdf
RO 74787.pdf
pdf • Oct 4, 2024, 1:35 PM • 1,110,865 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims Paid AO/74787/RO 74787.pdf
PREAUTH.pdf
main-pdf • Oct 4, 2024, 1:31 PM • 11,541 bytes
/home/openclaw/nas/Dropbox/BARV600/Claims Paid AO/74787/PREAUTH.pdf