Claim explorer / evidence thread
Claim 73781-1
MYRV 12024 • Stephanie • Approved / Unpaid • open-range
risk 0.00
deadline Approaching deadline
images 0
matched 1
review 8
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
38d elapsed • 0d remaining
Analyzed
Completed stage
38d elapsed • 0d remaining
Awaiting OEM
Completed stage
38d elapsed • 0d remaining
Auto-Approved
Approaching deadline
38d elapsed • 0d remaining
Payment Due
Upcoming statutory deadline
38d elapsed • 7d remaining
Escalation Eligible
Upcoming statutory deadline
38d elapsed • 0d remaining
Resolved
Upcoming statutory deadline
38d elapsed • 0d remaining
AI Claim Analysis
Estimated Recovery Amount
$1,125.00
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
1
No flagged violation label yet — keep reviewing payment and document evidence
Missing Items
8
No active evidence gaps are listed.
Deadline Status
Approaching deadline
38 days open in the visible workflow.
Recommended Action
Await OEM Response
This is the fastest next move from the current workflow stage.
Dossier completeness
Files 19 • RO lines 18 • human-described photos 0 • 3C red • reconciliation reconciled • linked side comments 1
Gaps: no human level images • no human level image description • three c not quality ready • sidebar comment coherence not supported
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
10
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: Sep 25, 2026, 12:19 PM to Sep 30, 2026, 2:55 AM.
Indexed evidence
4 docs / 0 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Monitor
38 days open in the visible workflow; risk score 0.00.
Claim Summary
Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/MYRV 12024/5- Pre-Authorizations Approved- MYRV/Open Range/73781-1/JOB_02_2026.09.24_10.48.01.jpg
Timeline
First seen Sep 25, 2026, 12:19 PM • last seen Sep 30, 2026, 2:55 AM
Evidence flags
No active evidence gap flags
Comment Intelligence
Thread depth
9 indexed side comments on this claim.
Latest visible thread signal
Oct 20, 2026, 11:09 PM • processor • TESTING AND LEARNING — Testing/Learning claim review: MYRV RO 73781-1.
PA J01631181 is approved for 0.1 hour on the missing black-tank termination handle, with shop supplies noted, and 2.0 hours on the bowed dinette wal
Role mix
Dealer 0 • OEM 0 • Processor 6
Decision cues
Denial signals 0 • info / missing-doc asks 6 • approval signals 5
Best move
Work missing-doc or reply asks first from the thread.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
No browser-previewable images were available for this claim yet.
Claim Lines
complaint
Missing black tank termination handle
needs-review • confidence 0.00
complaint
Missing black tank termination handle
partial-match • confidence 0.38
complaint
Missing black tank termination handle
partial-match • confidence 0.42
cause
Handle was missing INC., MYERS "RV" CENTER, Customer #: 1000
needs-review • confidence 0.00
cause
Handle was missing INC., MYERS "RV" CENTER, Customer #: 1000
needs-review • confidence 0.32
cause
Handle was missing INC., MYERS "RV" CENTER, Customer #: 1000
needs-review • confidence 0.31
correction
Order and install new black tank termination handle requesting 10 mins
needs-review • confidence 0.00
correction
Order and install new black tank termination handle requesting 10 mins
partial-match • confidence 0.38
correction
Order and install new black tank termination handle requesting 10 mins
partial-match • confidence 0.42
complaint
Wall panel by dinette is bowing very badly
partial-match • confidence 0.37
complaint
Wall panel by dinette is bowing very badly
partial-match • confidence 0.51
complaint
Wall panel by dinette is bowing very badly
partial-match • confidence 0.47
cause
Unknown
needs-review • confidence 0.21
cause
Unknown
needs-review • confidence 0.31
cause
Unknown
needs-review • confidence 0.29
correction
In order to fix the Bowing wall panel by dinette I will need to remove the front side dinette seat closest to the bed ,which will require removal of backrest .to remove the backrest of the dinette seat I will need to remove the two screws securing it to the wall panel .once the screws are removed I can then start to remove the screws under the seat that secure the seat to the floor ,total of 8 screws holding seat to the floor will have to be removed . Once the 8 screws on the bottom and the two screws on top are removed I can then remove the dinette seat out of the unit so that I can then start to peel off the old seam tape so I can get access to the finish staples securing wall panel to the wall .once access is gained to the staples I need to remove all staples securing wall panel to frame .once staples are removed I need to pull the wall panel overlapping the front most panel in order to then make a line where I need to trim the wall panel so it will sit flush against the wall and not bow outwards . Once wall panel is cut to size I can then re install finish staples to secure paneling to wall .once panel is stalled to the wall I can then run a new line of seam tape over the staples to hide staples .once seam tape is installed over new staples I can then re install the 8 screws holding the dinette seat to the floor .once it is secured to the floor I can then re install the back rest for dinette seat . Requesting 3 hours for repair
partial-match • confidence 0.46
correction
In order to fix the Bowing wall panel by dinette I will need to remove the front side dinette seat closest to the bed ,which will require removal of backrest .to remove the backrest of the dinette seat I will need to remove the two screws securing it to the wall panel .once the screws are removed I can then start to remove the screws under the seat that secure the seat to the floor ,total of 8 screws holding seat to the floor will have to be removed . Once the 8 screws on the bottom and the two screws on top are removed I can then remove the dinette seat out of the unit so that I can then start to peel off the old seam tape so I can get access to the finish staples securing wall panel to the wall .once access is gained to the staples I need to remove all staples securing wall panel to frame .once staples are removed I need to pull the wall panel overlapping the front most panel in order to then make a line where I need to trim the wall panel so it will sit flush against the wall and not bow outwards . Once wall panel is cut to size I can then re install finish staples to secure paneling to wall .once panel is stalled to the wall I can then run a new line of seam tape over the staples to hide staples .once seam tape is installed over new staples I can then re install the 8 screws holding the dinette seat to the floor .once it is secured to the floor I can then re install the back rest for dinette seat . Requesting 3 hours for repair
matched • confidence 0.80
correction
In order to fix the Bowing wall panel by dinette I will need to remove the front side dinette seat closest to the bed ,which will require removal of backrest .to remove the backrest of the dinette seat I will need to remove the two screws securing it to the wall panel .once the screws are removed I can then start to remove the screws under the seat that secure the seat to the floor ,total of 8 screws holding seat to the floor will have to be removed . Once the 8 screws on the bottom and the two screws on top are removed I can then remove the dinette seat out of the unit so that I can then start to peel off the old seam tape so I can get access to the finish staples securing wall panel to the wall .once access is gained to the staples I need to remove all staples securing wall panel to frame .once staples are removed I need to pull the wall panel overlapping the front most panel in order to then make a line where I need to trim the wall panel so it will sit flush against the wall and not bow outwards . Once wall panel is cut to size I can then re install finish staples to secure paneling to wall .once panel is stalled to the wall I can then run a new line of seam tape over the staples to hide staples .once seam tape is installed over new staples I can then re install the 8 screws holding the dinette seat to the floor .once it is secured to the floor I can then re install the back rest for dinette seat . Requesting 3 hours for repair
partial-match • confidence 0.62
Evidence Thread
Jessica Lindaman
dealer_or_external • Sep 25, 2026, 12:10 PM
@Jeannette B
Stephanie Kendziorski
processor • Sep 25, 2026, 4:13 PM
Submitted PA J01631181
Stephanie Kendziorski
processor • Sep 28, 2026, 4:58 PM
@Jeannette B Jayco would like to know if the tech tried adding a longer screw to pull the wall panel to the dinette.
Jeannette Britton
dealer_or_external • Sep 29, 2026, 9:59 AM
@Stephanie K I do not believe so since the wall, according to his correction, is to big causing it to bow and needs to be cut. Putting a longer screw in will not shrink the panel.
Stephanie Kendziorski
processor • Sep 29, 2026, 12:03 PM
@Jeannette B Job 1 will have shop supplies
JOb 1 approved .1
Job 2 approved .2
Jeannette Britton
dealer_or_external • Oct 2, 2026, 6:24 PM
@Stephanie K Is the tech supposed to just add a longer screw and have it stayed bowed? I'm not sure what to tell the tech to do.
Stephanie Kendziorski
processor • Oct 2, 2026, 6:52 PM
@Jeannette B Sorry, that was my fault. It was supposed to be approved for 2.0 hours to repair the wall.
Stephanie Kendziorski
processor • Oct 2, 2026, 6:52 PM
It was a typo on my end.
iClaims AI
processor • Oct 20, 2026, 11:09 PM
TESTING AND LEARNING — Testing/Learning claim review: MYRV RO 73781-1.
PA J01631181 is approved for 0.1 hour on the missing black-tank termination handle, with shop supplies noted, and 2.0 hours on the bowed dinette wall. The 0.2-hour wall entry was explicitly corrected as a typo in the replies. Do not carry that old figure or the unresolved longer-screw discussion forward as the current decision.
The 18 photos show the missing handle and bowed wall, but no finished repair. The RO describes ordering/installing the handle and removing the dinette to trim/resecure the wall panel; completion and invoice fields remain blank. Please confirm handle availability/installation and whether the wall repair is completed or scheduled. Record the actual cause found, correction, completion date, valve operation and wall/dinette reassembly check. The cause field still says unknown even though the proposed correction attributes the bow to panel fit.
Use the corrected 2.0-hour wall approval when preparing the final claim; the requested three hours is not fully authorized. No final claim submission or payment is demonstrated here. Learning: reconcile corrected approval replies before billing, and turn proposed repair language into dated findings and completed-work documentation. @Chris B @Heidi H @Tricia H
Claim Files
73781-1.pdf
main-pdf • Sep 25, 2026, 12:10 PM • 390,322 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/5- Pre-Authorizations Approved- MYRV/Open Range/73781-1/73781-1.pdf
73781-1.pdf
main-pdf • Sep 25, 2026, 12:10 PM • 390,322 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/3- Pre-Authorizations Information Needed- iCS-MYRV/Open Range/73781-1/73781-1.pdf
73781-1.pdf
main-pdf • Sep 25, 2026, 12:10 PM • 390,322 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/2-Pre-Authorizations Pending- iCS/Open Range/73781-1/73781-1.pdf
73781-1.pdf
main-pdf • Sep 25, 2026, 12:10 PM • 390,322 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/1- Pre-Authorizations Needed- iCS/Open Range/73781-1/73781-1.pdf