Claim explorer / evidence thread
Claim 73203
MYRV 12024 • Stephanie • Approved / Unpaid • prime-time
risk 0.70
deadline Overdue / escalation ready
images 9
matched 0
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
58d elapsed • 0d remaining
Analyzed
Completed stage
58d elapsed • 0d remaining
Awaiting OEM
Completed stage
58d elapsed • 0d remaining
Auto-Approved
Overdue / escalation ready
58d elapsed • 0d remaining • Overdue
Payment Due
Upcoming statutory deadline
58d elapsed • 0d remaining
Escalation Eligible
Upcoming statutory deadline
58d elapsed • 0d remaining
Resolved
Upcoming statutory deadline
58d elapsed • 0d remaining
AI Claim Analysis
Estimated Recovery Amount
$375.00
What this claim may still be worth based on current evidence.
Compliance Score
30/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
1
OEM Response Deadline Exceeded
Missing Items
0
missing_unit_id_photo • damage_signal_without_damage_photo
Deadline Status
Overdue / escalation ready
58 days open in the visible workflow.
Recommended Action
Await OEM Response
This is the fastest next move from the current workflow stage.
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
11
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: May 7, 2026, 5:05 AM to Jun 20, 2026, 1:12 AM.
Indexed evidence
3 docs / 9 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
58 days open in the visible workflow; risk score 0.70.
Claim Summary
Evidence summary
images=9; damage=0; unit=0; parts=0; doc=9; gaps=missing_unit_id_photo,damage_signal_without_damage_photo • Unit 2026 Prime Time • VIN 5ZT2AVSB2TB941670
Path
/home/openclaw/nas/Dropbox/MYRV 12024/5- Pre-Authorizations Approved- MYRV/Prime Time/73203/WO_73203_JOB_1_2026.04.23_09.27.12.jpg
Timeline
First seen May 7, 2026, 5:05 AM • last seen Jun 20, 2026, 1:12 AM
Evidence flags
missing unit id photo • damage signal without damage photo
Comment Intelligence
Thread depth
4 indexed side comments on this claim.
Latest visible thread signal
Jul 1, 2026, 10:07 AM • processor • Paid $898.78 check 3185243 6/30/2026
Role mix
Dealer 0 • OEM 0 • Processor 4
Decision cues
Denial signals 0 • info / missing-doc asks 0 • approval signals 1
Best move
Thread shows approval language — verify payment / closeout.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
Claim Lines
complaint
FLOOR DAMAGED
partial-match • confidence 0.63
complaint
FLOOR DAMAGED
unreviewed • confidence 0.00
complaint
FLOOR DAMAGED
unreviewed • confidence 0.00
complaint
FLOOR DAMAGED
unreviewed • confidence 0.00
complaint
FLOOR DAMAGED
unreviewed • confidence 0.00
cause
Slide caught loose vinyl INC., MYERS "RV" CENTER, Customer #: 1000
partial-match • confidence 0.63
cause
Slide caught loose vinyl INC., MYERS "RV" CENTER, Customer #: 1000
unreviewed • confidence 0.00
cause
Slide caught loose vinyl INC., MYERS "RV" CENTER, Customer #: 1000
unreviewed • confidence 0.00
cause
Slide caught loose vinyl INC., MYERS "RV" CENTER, Customer #: 1000
unreviewed • confidence 0.00
cause
Slide caught loose vinyl INC., MYERS "RV" CENTER, Customer #: 1000
unreviewed • confidence 0.00
correction
During inspection of the flooring in the kitchen area, a significant tear and surface damage was identified in the existing vinyl flooring. The damage extended through the ware layer and compromise the integrity of the overall appearance of the floor requiring repair.see picture. To verify operation and check for any interference, the slide was cycled in an out total of four times. During testing, the slide operated as a design and cleared the affected area each time with no signs of catching or additional damage. In order to complete the proper and seamless repair, replacement of the affected section of vinyl flooring is required. To ensure sufficient material for correct pattern alignment and full coverage during the patch process, an 8 x 15 section of matching vinyl flooring will need to be ordered. This will allow for proper fitment, trimming, and alignment to achieve a professional and durable repair 2.85HRS Labor Job # Description Total *1000* 1 REPAIR FLOOR N/C Subtotal for Job #1: 0.00 Parts Total: 0.00 Labour Total: 0.00 Sublet Total: 0.00 Extras Total: 0.00 WORK ORDER TOTAL: 0.00
partial-match • confidence 0.77
correction
During inspection of the flooring in the kitchen area, a significant tear and surface damage was identified in the existing vinyl flooring. The damage extended through the ware layer and compromise the integrity of the overall appearance of the floor requiring repair.see picture. To verify operation and check for any interference, the slide was cycled in an out total of four times. During testing, the slide operated as a design and cleared the affected area each time with no signs of catching or additional damage. In order to complete the proper and seamless repair, replacement of the affected section of vinyl flooring is required. To ensure sufficient material for correct pattern alignment and full coverage during the patch process, an 8 x 15 section of matching vinyl flooring will need to be ordered. This will allow for proper fitment, trimming, and alignment to achieve a professional and durable repair 2.85HRS Labor Job # Description Total *1000* 1 REPAIR FLOOR N/C Subtotal for Job #1: 0.00 Parts Total: 0.00 Labour Total: 0.00 Sublet Total: 0.00 Extras Total: 0.00 WORK ORDER TOTAL: 0.00
unreviewed • confidence 0.00
correction
During inspection of the flooring in the kitchen area, a significant tear and surface damage was identified in the existing vinyl flooring. The damage extended through the ware layer and compromise the integrity of the overall appearance of the floor requiring repair.see picture. To verify operation and check for any interference, the slide was cycled in an out total of four times. During testing, the slide operated as a design and cleared the affected area each time with no signs of catching or additional damage. In order to complete the proper and seamless repair, replacement of the affected section of vinyl flooring is required. To ensure sufficient material for correct pattern alignment and full coverage during the patch process, an 8 x 15 section of matching vinyl flooring will need to be ordered. This will allow for proper fitment, trimming, and alignment to achieve a professional and durable repair 2.85HRS Labor Job # Description Total *1000* 1 REPAIR FLOOR N/C Subtotal for Job #1: 0.00 Parts Total: 0.00 Labour Total: 0.00 Sublet Total: 0.00 Extras Total: 0.00 WORK ORDER TOTAL: 0.00
unreviewed • confidence 0.00
correction
During inspection of the flooring in the kitchen area, a significant tear and surface damage was identified in the existing vinyl flooring. The damage extended through the ware layer and compromise the integrity of the overall appearance of the floor requiring repair.see picture. To verify operation and check for any interference, the slide was cycled in an out total of four times. During testing, the slide operated as a design and cleared the affected area each time with no signs of catching or additional damage. In order to complete the proper and seamless repair, replacement of the affected section of vinyl flooring is required. To ensure sufficient material for correct pattern alignment and full coverage during the patch process, an 8 x 15 section of matching vinyl flooring will need to be ordered. This will allow for proper fitment, trimming, and alignment to achieve a professional and durable repair 2.85HRS Labor Job # Description Total *1000* 1 REPAIR FLOOR N/C Subtotal for Job #1: 0.00 Parts Total: 0.00 Labour Total: 0.00 Sublet Total: 0.00 Extras Total: 0.00 WORK ORDER TOTAL: 0.00
unreviewed • confidence 0.00
correction
During inspection of the flooring in the kitchen area, a significant tear and surface damage was identified in the existing vinyl flooring. The damage extended through the ware layer and compromise the integrity of the overall appearance of the floor requiring repair.see picture. To verify operation and check for any interference, the slide was cycled in an out total of four times. During testing, the slide operated as a design and cleared the affected area each time with no signs of catching or additional damage. In order to complete the proper and seamless repair, replacement of the affected section of vinyl flooring is required. To ensure sufficient material for correct pattern alignment and full coverage during the patch process, an 8 x 15 section of matching vinyl flooring will need to be ordered. This will allow for proper fitment, trimming, and alignment to achieve a professional and durable repair 2.85HRS Labor Job # Description Total *1000* 1 REPAIR FLOOR N/C Subtotal for Job #1: 0.00 Parts Total: 0.00 Labour Total: 0.00 Sublet Total: 0.00 Extras Total: 0.00 WORK ORDER TOTAL: 0.00
unreviewed • confidence 0.00
Evidence Thread
Ashlee Olsen
processor • Apr 29, 2026, 2:46 PM
submitted PA#2658904
Stephanie Kendziorski
processor • Apr 29, 2026, 3:53 PM
@Brian P Approved 3.0
Stephanie Kendziorski
processor • Jun 24, 2026, 11:51 PM
Submitted for payment
Stephanie Kendziorski
processor • Jul 1, 2026, 10:07 AM
Paid $898.78 check 3185243 6/30/2026
Claim Files
73203.pdf
main-pdf • Apr 29, 2026, 10:45 AM • 416,507 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/5- Pre-Authorizations Approved- MYRV/Prime Time/73203/73203.pdf
73203.pdf
main-pdf • Apr 29, 2026, 10:45 AM • 416,507 bytes
/home/openclaw/nas/Dropbox/#recycle/MYRV 12024/2-Pre-Authorizations Pending- iCS/Prime Time/73203/73203.pdf
73203.pdf
main-pdf • Apr 29, 2026, 10:45 AM • 416,507 bytes
/home/openclaw/nas/Dropbox/#recycle/MYRV 12024/1- Pre-Authorizations Needed- iCS/Prime Time/73203/73203.pdf