Claim explorer / evidence thread
Claim 72313
MYRV 12024 • Stephanie • Write Off • open-range
risk 0.00
deadline Overdue / escalation ready
images 0
matched 0
review 6
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
145d elapsed • 0d remaining
Analyzed
Completed stage
145d elapsed • 0d remaining
Awaiting OEM
Completed stage
145d elapsed • 0d remaining
Auto-Approved
Completed stage
145d elapsed • 0d remaining
Payment Due
Completed stage
145d elapsed • 0d remaining
Escalation Eligible
Overdue / escalation ready
145d elapsed • 0d remaining • Overdue
Resolved
Upcoming statutory deadline
145d elapsed • 0d remaining
AI Claim Analysis
Estimated Recovery Amount
Pending payment match
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
6
No active evidence gaps are listed.
Deadline Status
Overdue / escalation ready
145 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.
Dossier completeness
Files 5 • RO lines 6 • human-described photos 4 • 3C yellow • reconciliation reconciled • linked side comments 0
Gaps: three c not quality ready • sidebar comments not linked • sidebar comment coherence not supported
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
5
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: Jun 8, 2026, 7:49 PM to Jun 25, 2026, 2:54 AM.
Indexed evidence
1 docs / 4 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
145 days open in the visible workflow; risk score 0.00.
Claim Summary
Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/MYRV 12024/Write Off/72313/WO_72313_JOB_5_2025.10.13_14.06.24.jpg
Timeline
First seen Jun 8, 2026, 7:49 PM • last seen Jun 25, 2026, 2:54 AM
Evidence flags
No active evidence gap flags
Comment Intelligence
Thread depth
1 indexed side comments on this claim.
Latest visible thread signal
Feb 11, 2026, 5:12 PM • processor • @Brian P Hey! Jeannette had a similar one earlier today. This claim was denied because it was submitted for payment and the start and end dates of the repair were more than 30 days apart. It was put in "Revise" by Jayco
Role mix
Dealer 0 • OEM 0 • Processor 1
Decision cues
Denial signals 2 • info / missing-doc asks 0 • approval signals 1
Best move
Escalation / denial review should happen before more packet browsing.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
document-photo
RV roof close-up showing a black solar cable roof entry/junction cover labeled “Go Power!” and “SOLAR.” Two black cable connectors enter from the left. The surrounding white roof sealant/lap sealant is heavily applied, uneven, cracked/split, and dirty, especially along the right and lower edges, with possible gaps or failed adhesion around the fitting. Screws/fasteners are visible at corners under/near sealant.
No document or screenshot text besides the molded “Go Power!” / “SOLAR” marking. Ima
Human interpretation • confidence 0.00
document-photo
- **Visible damage:** No clear damage visible in this image. Scene appears to be a general lot/context photo.
- **Parts/components visible:** Multiple RV/motorhomes parked outside; metal rolling/industrial staircase and platform next to a corrugated metal building; traffic cones near a coach; concrete service lot.
- **Labels/text:** No readable labels, VINs, work order text, or part markings visible.
- **Repair context:** Likely dealership/service yard exterior photo; may document unit location
Human interpretation • confidence 0.00
document-photo
Close-up of an RV exterior window or sliding glass door assembly. Visible components include dark/black vertical frame extrusion, adjacent metallic trim, glass pane, and weatherstrip/seal channel. The glass is reflective, showing the service yard, fence/screen pattern, trash cans, and nearby RVs.
Visible condition: no clear crack, breakage, missing part, or major deformation is evident. Minor smudges/scuffs on the glass/trim may be present but damage is not clearly confirmed from this photo.
N
Human interpretation • confidence 0.00
document-photo
RV side window shown; no clear damage visible.
Human interpretation • confidence 0.68
Claim Lines
complaint
CLAIMS: J01428979-001
needs-review • confidence 0.00
cause
RESUBMIT WERT, MATTHEW THOMAS Customer #: 59770 Subtotal for Job #0: 0.00 Job #3 - Warranty COMPLAINT: CUSTOMER STATES CHECK SOLAR SYSTEM. THE BATTERIES KEEP DYING WOULD LIKE A WALK THROUGH IF POSSIBLE TO MAKE SURE THEY KNOW HOW IT WORKS. CAUSE: Go power jack on the roof is bad
needs-review • confidence 0.12
correction
REMOVED AND REPLACED
needs-review • confidence 0.00
complaint
CUSTOMER STATES EMERGENCY WINDOW SEAL NOT SEALING PROPERLY AT SLIDE
needs-review • confidence 0.22
cause
Leaking seal on slide window to the rear of the slide room
needs-review • confidence 0.22
correction
REMOVED AND REPLACED SEAL
needs-review • confidence 0.11
Evidence Thread
Stephanie Kendziorski
processor • Feb 11, 2026, 5:12 PM
@Brian P Hey! Jeannette had a similar one earlier today. This claim was denied because it was submitted for payment and the start and end dates of the repair were more than 30 days apart. It was put in "Revise" by Jayco back in November to correct those dates and there was never a response entered. They denied it January 5th. This work order, as it is, I could likely get it approved again, but when we went to claim it for payment, it would deny. The completed date is more than 60 days ago, and Jayco won't pay work more than 60 days old.
Note: It was originally submitted as work order 72037.
Claim Files
72313.pdf
main-pdf • Feb 11, 2026, 3:56 PM • 417,626 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/Write Off/72313/72313.pdf