Claim explorer / evidence thread
Claim 72253
MYRV 12024 • Stephanie • Paid • open-range
risk 0.00
deadline Overdue / escalation ready
images 0
matched 0
review 12
Warranty deadline timeline
Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
178d elapsed • 0d remaining
Analyzed
Completed stage
178d elapsed • 0d remaining
Awaiting OEM
Completed stage
178d elapsed • 0d remaining
Auto-Approved
Completed stage
178d elapsed • 0d remaining
Payment Due
Completed stage
178d elapsed • 0d remaining
Escalation Eligible
Completed stage
178d elapsed • 0d remaining
Resolved
Overdue / escalation ready
178d elapsed • 0d remaining • Overdue
AI Claim Analysis
Estimated Recovery Amount
Pending payment match
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
12
No active evidence gaps are listed.
Deadline Status
Overdue / escalation ready
178 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.
Dossier completeness
Dossier has not been generated yet. Evidence presence is not treated as complete.
US dispute readiness
Evidence packet check
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
18
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: May 7, 2026, 5:05 AM to Jun 25, 2026, 2:54 AM.
Indexed evidence
3 docs / 19 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
178 days open in the visible workflow; risk score 0.00.
Claim Summary
Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/MYRV 12024/8- Claims Paid/January 2026/Open Range/72253F/72253/Approval.pdf
Timeline
First seen May 7, 2026, 5:05 AM • last seen Jun 25, 2026, 2:54 AM
Evidence flags
No active evidence gap flags
Comment Intelligence
Thread depth
9 indexed side comments on this claim.
Latest visible thread signal
Dec 23, 2025, 2:59 PM • dealer_or_external • Thank you. I order the panel today
Role mix
Dealer 0 • OEM 0 • Processor 5
Decision cues
Denial signals 0 • info / missing-doc asks 2 • approval signals 2
Best move
Work missing-doc or reply asks first from the thread.
Quick Actions
Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.
Images
document-photo
Close-up of RV tank-monitor control panel with tank, battery, and pump labels.
Human interpretation • confidence 0.86
document-photo
KIB Micro Monitor tank and battery indicator panel with 3-way pump switch.
Human interpretation • confidence 0.96
document-photo
Photo of an RV tank-monitor control panel; no clear damage visible.
Human interpretation • confidence 0.91
document-photo
Water is visible on vinyl flooring beneath a white braided hose routed through cabinetry.
Human interpretation • confidence 0.88
document-photo
Close-up of RV plumbing hoses and a red/white valve fitting; no clear damage visible.
Human interpretation • confidence 0.82
document-photo
Completed vehicle pre-delivery inspection form for WO 72253 dated 12-15.
Human interpretation • confidence 0.92
document-photo
Photo shows a gray shower pan/base with perimeter trim and a drain opening.
Human interpretation • confidence 0.68
document-photo
Photo of a Micro-Series electronic control panel circuit board with wiring and work-order label.
Human interpretation • confidence 0.94
document-photo
Interior utility area with red/blue water lines, fittings, and insulated ductwork; no clear damage visible.
Human interpretation • confidence 0.78
supporting-image
Exterior passenger-side view of an Open Range Colt travel trailer; no clear damage visible.
Human interpretation • confidence 0.86
supporting-image
Open Range travel trailer exterior; no clear damage visible in this image.
Human interpretation • confidence 0.92
supporting-image
Rear view of an Open Range travel trailer; no visible exterior damage.
Human interpretation • confidence 0.92
supporting-image
Exterior view of an Open Range Colt travel trailer; no clear damage or repair evidence visible.
Human interpretation • confidence 0.86
supporting-image
Wet flooring beside a white braided hose in an interior cabinet area.
Human interpretation • confidence 0.86
supporting-image
Photo shows an interior shower base/pan with drain opening and threshold.
Human interpretation • confidence 0.62
supporting-image
Close-up of red and blue plumbing hoses with clamps beside foil insulation.
Human interpretation • confidence 0.72
supporting-image
Close-up of wiring and a labeled hose/line; no clear damage visible.
Human interpretation • confidence 0.42
supporting-image
Close-up of RV cabinet interior showing insulated ducting, hoses, and plumbing connections.
Human interpretation • confidence 0.76
supporting-image
White dual-basin sink with pink liquid splatter and a clear tube across one basin.
Human interpretation • confidence 0.90
Claim Lines
complaint
PRE-PDI NEW TT - 3.0
needs-review • confidence 0.06
cause
PDI NEEDED INC., MYERS "RV" CENTER, Customer #: 1000
needs-review • confidence 0.00
correction
PDI COMPLETED
needs-review • confidence 0.06
complaint
WINTERIZE STANDARD
needs-review • confidence 0.00
cause
Winterize unit.
needs-review • confidence 0.00
correction
Winterized unit.
needs-review • confidence 0.00
complaint
Monitor panel is damaged.
needs-review • confidence 0.21
cause
Monitor panel is damaged needs to be replaced.
needs-review • confidence 0.21
correction
Remove and replace monitor panel with new one. Part on order .20HRS
needs-review • confidence 0.21
complaint
Toilet will not flush has no water pressure.
needs-review • confidence 0.05
cause
Water line to toilet has a kink behind wall.
needs-review • confidence 0.05
correction
Disconnected water line to toilet to access kink inside of cabinet removed water line and cut out kink in water line. Reinstalled inside cabinet and reconnected to toilet. 1.00HRS
needs-review • confidence 0.32
Evidence Thread
Stephanie Kendziorski
processor • Dec 18, 2025, 11:22 AM
@Jeannette B Please let me know the requested labor times for lines 1 & 2. Thank you.
Stephanie Kendziorski
processor • Dec 18, 2025, 11:22 AM
@Jeannette B Please let me know the requested labor times for lines 1 & 2. Thank you.
@Jeff M @Sarah C
Jeff Myers
dealer_or_external • Dec 18, 2025, 11:31 AM
@Brian P can you help Jeannette with labor times for lines 1 & 2
Brian Parrott
dealer_or_external • Dec 18, 2025, 11:41 AM
I updated the workorder with labor times on the jobs @Stephanie K
Jeff Myers
dealer_or_external • Dec 18, 2025, 1:03 PM
Stephanie, Do we need to upload another RO to be able to add times. like Brian just did?? can't we just itemize it in this thread? Making sure we aren't wasting time on our end
Stephanie Kendziorski
processor • Dec 18, 2025, 1:04 PM
Yes! You absolutely can tell me labor times for each line in the thread.
Stephanie Kendziorski
processor • Dec 23, 2025, 12:05 PM
Submitted PA J01486585
Stephanie Kendziorski
processor • Dec 23, 2025, 2:21 PM
@Jeannette B JOb 1 approved .2
Job 2 approved 1.0
Jeannette Britton
dealer_or_external • Dec 23, 2025, 2:59 PM
Thank you. I order the panel today
Claim Files
Approval.pdf
main-pdf • Dec 23, 2025, 2:22 PM • 5,456 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/8- Claims Paid/January 2026/Open Range/72253F/72253/Approval.pdf
72253-R.pdf
main-pdf • Dec 18, 2025, 12:34 PM • 317,382 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/8- Claims Paid/January 2026/Open Range/72253F/72253/72253-R.pdf
72253.pdf
main-pdf • Dec 17, 2025, 5:07 PM • 320,524 bytes
/home/openclaw/nas/Dropbox/MYRV 12024/8- Claims Paid/January 2026/Open Range/72253F/72253/72253.pdf