iClaims logo
Internal operations platform

Claim Detail

Search result → immediate full claim view.
Home
Claim explorer / evidence thread
Claim 40640
LIN 1025 • Alix • Paid • jayco
Next Recommended Action

Escalate to State

Payment deadline violated
Reason
OEM Response Deadline Exceeded
Deadline
Payment deadline violated
Estimated recovery
Pending payment match
risk 0.00 deadline Overdue / escalation ready images 0 matched 0 review 27

Warranty deadline timeline

Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
135d elapsed • 0d remaining
Analyzed
Completed stage
135d elapsed • 0d remaining
Awaiting OEM
Completed stage
135d elapsed • 0d remaining
Auto-Approved
Completed stage
135d elapsed • 0d remaining
Payment Due
Completed stage
135d elapsed • 0d remaining
Escalation Eligible
Completed stage
135d elapsed • 0d remaining
Resolved
Overdue / escalation ready
135d elapsed • 0d remaining • Overdue

AI Claim Analysis

Estimated Recovery Amount
Pending payment match
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
27
No active evidence gaps are listed.
Deadline Status
Overdue / escalation ready
135 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.

Dossier completeness

Dossier has not been generated yet. Evidence presence is not treated as complete.

US dispute readiness

Evidence packet check

Full evidence packet
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
41
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Full evidence packet
Estimated packet is large. Prepare a concise executive chronology with full backup evidence separated.
Chronology
Ready to order
Visible span: Jun 19, 2026, 2:56 AM to Oct 27, 2026, 2:55 AM.
Indexed evidence
22 docs / 24 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
135 days open in the visible workflow; risk score 0.00.

Claim Summary

Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/LIN 1025/8-Claims Paid/40640/40640 final.pdf
Timeline
First seen Jun 19, 2026, 2:56 AM • last seen Oct 27, 2026, 2:55 AM
Evidence flags
No active evidence gap flags

Comment Intelligence

Thread depth
12 indexed side comments on this claim.
Latest visible thread signal
Aug 28, 2026, 9:00 AM • processor • @cody e @Jeremy G This claim paid on 8/24/26 on check 00134321 Job A: Labor $82.50 Job C: Labor $82.50 Parts $3.90
Role mix
Dealer 0 • OEM 0 • Processor 9
Decision cues
Denial signals 0 • info / missing-doc asks 1 • approval signals 7
Best move
Work missing-doc or reply asks first from the thread.

Quick Actions

Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.

Images

Claim Lines

complaint
Door latch needs to be adjusted
needs-review • confidence 0.09
complaint
Door latch needs to be adjusted
needs-review • confidence 0.09
complaint
Door latch needs to be adjusted
needs-review • confidence 0.09
cause
MsalMsadj Found door latch out of adjustment
needs-review • confidence 0.09
cause
MsalMsadj Found door latch out of adjustment
needs-review • confidence 0.09
cause
MsalMsadj Found door latch out of adjustment
needs-review • confidence 0.09
correction
Adjusted striker plate on door and lubricated the handle and latch Transaction Disp. Adj. Reason Req. Approved Approved type Main Op. Operation no Item number code Code Description Req. qty Unit Unit price amount quantity amount
needs-review • confidence 0.09
correction
Adjusted striker plate on door and lubricated the handle and latch Transaction Disp. Adj. Reason Req. Approved Approved type Main Op. Operation no Item number code Code Description Req. qty Unit Unit price amount quantity amount
needs-review • confidence 0.09
correction
Adjusted striker plate on door and lubricated the handle and latch Transaction Disp. Adj. Reason Req. Approved Approved type Main Op. Operation no Item number code Code Description Req. qty Unit Unit price amount quantity amount
needs-review • confidence 0.09
complaint
Scratch on bathroom cabinet over the sink
needs-review • confidence 0.04
complaint
Scratch on bathroom cabinet over the sink
needs-review • confidence 0.04
complaint
Scratch on bathroom cabinet over the sink
needs-review • confidence 0.11
cause
Chipd There is a scratch in the door, it looks like something rubbed against the finish of the cabinet door, light denting in the wood.
needs-review • confidence 0.08
cause
Chipd There is a scratch in the door, it looks like something rubbed against the finish of the cabinet door, light denting in the wood.
needs-review • confidence 0.08
cause
Chipd There is a scratch in the door, it looks like something rubbed against the finish of the cabinet door, light denting in the wood.
needs-review • confidence 0.15
correction
Please advise is you would like us to repair or replace this. There is no repair we can do at this time. Transaction Disp. Adj. Reason Req. Approved Approved type Main Op. Operation no Item number code Code Description Req. qty Unit Unit price amount quantity amount
needs-review • confidence 0.00
correction
Please advise is you would like us to repair or replace this. There is no repair we can do at this time. Transaction Disp. Adj. Reason Req. Approved Approved type Main Op. Operation no Item number code Code Description Req. qty Unit Unit price amount quantity amount
needs-review • confidence 0.00
correction
Please advise is you would like us to repair or replace this. There is no repair we can do at this time. Transaction Disp. Adj. Reason Req. Approved Approved type Main Op. Operation no Item number code Code Description Req. qty Unit Unit price amount quantity amount
needs-review • confidence 0.00
complaint
Outside shower is not hooked up to cold water.
needs-review • confidence 0.12
complaint
Outside shower is not hooked up to cold water.
needs-review • confidence 0.12
complaint
Outside shower is not hooked up to cold water.
needs-review • confidence 0.00
cause
InstInc OUtside shower has no cold water. Removed outside shower and found cold water line was kinked off at back of shower.
needs-review • confidence 0.17
cause
InstInc OUtside shower has no cold water. Removed outside shower and found cold water line was kinked off at back of shower.
needs-review • confidence 0.17
cause
InstInc OUtside shower has no cold water. Removed outside shower and found cold water line was kinked off at back of shower.
needs-review • confidence 0.05
correction
Removed Pex clamp, removed fitting, cut kinked section of hose out. Reinstalled fitting in hose, crimped and connected. Tested shower, work as it should now. Clean and reseal shower. Transaction Disp. Adj. Reason Req. Approved Approved type Main Op. Operation no Item number code Code Description Req. qty Unit Unit price amount quantity amount
needs-review • confidence 0.16
correction
Removed Pex clamp, removed fitting, cut kinked section of hose out. Reinstalled fitting in hose, crimped and connected. Tested shower, work as it should now. Clean and reseal shower. Transaction Disp. Adj. Reason Req. Approved Approved type Main Op. Operation no Item number code Code Description Req. qty Unit Unit price amount quantity amount
needs-review • confidence 0.16
correction
Removed Pex clamp, removed fitting, cut kinked section of hose out. Reinstalled fitting in hose, crimped and connected. Tested shower, work as it should now. Clean and reseal shower. Transaction Disp. Adj. Reason Req. Approved Approved type Main Op. Operation no Item number code Code Description Req. qty Unit Unit price amount quantity amount
needs-review • confidence 0.16

Evidence Thread

Stephanie Kendziorski
processor • Jun 18, 2026, 10:24 AM
Submitted PA J01575539
Stephanie Kendziorski
processor • Jun 18, 2026, 1:27 PM
@cody e @Jeremy G Job A - approved .5 Job B - approved .4 Job C - approved .5
cody eagle
dealer_or_external • Jun 18, 2026, 5:21 PM
@Jeremy G @Stephanie K this is ready to summit
cody eagle
dealer_or_external • Jun 22, 2026, 10:01 AM
@Alix M @Stephanie K @Jeremy G WE CAN REOPEN THE LINE IF THEY APPROVE REPLACING THE PART.
Alix Mongiat
processor • Jun 22, 2026, 10:08 AM
@cody e @Jeremy G @JASON S Job B was approved for 0.4 hour to replace cabinet door JAYCO P# 2072968 Do you want me to submit the other lines for payment?
Alix Mongiat
processor • Jun 23, 2026, 9:52 AM
There are comments on the final RO as well. Job B was approved to replace the door with part number provided. I need to know if they want to me to submit other jobs for payment while they wait for the part for Job B to come in.
Alix Mongiat
processor • Jun 30, 2026, 9:11 AM
Never received a response. Moving back to PA approved.
Alix Mongiat
processor • Aug 5, 2026, 1:16 PM
@cody e @Jeremy G @JASON S Job B was approved to replace the door JAYCO P# 2072968 In case you didn't know exactly. Sorry about that.
JASON SWENSON
dealer_or_external • Aug 5, 2026, 1:36 PM
THE DOOR IS NLA. I PUT THAT IN THE NOTE AWHILE BACK. ALL THE RO'S ARE CLOSED
Alix Mongiat
processor • Aug 14, 2026, 9:30 AM
There are no notes on this WO regarding that. Are we removing that line from the WO? I can remove that line if so.
Alix Mongiat
processor • Aug 14, 2026, 9:40 AM
Jobs A and C have been submitted for payment.
Alix Mongiat
processor • Aug 28, 2026, 9:00 AM
@cody e @Jeremy G This claim paid on 8/24/26 on check 00134321 Job A: Labor $82.50 Job C: Labor $82.50 Parts $3.90

Claim Files

40640 final.pdf
pdf • Jun 19, 2026, 7:30 AM • 401,130 bytes
/home/openclaw/nas/Dropbox/LIN 1025/7- Claims in Process/7.2- Claims Returned iCS-LIN/Jayco/40640/40640 final.pdf
40640 final.pdf
pdf • Jun 19, 2026, 7:30 AM • 401,130 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/6- Ready to Submit/Jayco/40640/40640 final.pdf
Approval.pdf
main-pdf • Jun 18, 2026, 1:27 PM • 142,394 bytes
/home/openclaw/nas/Dropbox/LIN 1025/7- Claims in Process/7.2- Claims Returned iCS-LIN/Jayco/40640/Approval.pdf
Approval.pdf
main-pdf • Jun 18, 2026, 1:27 PM • 142,394 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/6- Ready to Submit/Jayco/40640/Approval.pdf
Approval.pdf
main-pdf • Jun 18, 2026, 1:27 PM • 142,394 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/5-Pre-Authorizations Approved- LIN/Jayco/40640/Approval.pdf
Approval.pdf
main-pdf • Jun 18, 2026, 1:27 PM • 142,394 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/2-Pre-Authorizations Pending-iCS/Jayco/40640/Approval.pdf
RO# 40640 media.zip
zip • Jun 18, 2026, 9:59 AM • 35,950,384 bytes
/home/openclaw/nas/Dropbox/LIN 1025/7- Claims in Process/7.2- Claims Returned iCS-LIN/Jayco/40640/RO# 40640 media.zip
RO# 40640 media.zip
zip • Jun 18, 2026, 9:59 AM • 35,950,384 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/6- Ready to Submit/Jayco/40640/RO# 40640 media.zip
RO# 40640 media.zip
zip • Jun 18, 2026, 9:59 AM • 35,950,384 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/5-Pre-Authorizations Approved- LIN/Jayco/40640/RO# 40640 media.zip
RO# 40640 media.zip
zip • Jun 18, 2026, 9:59 AM • 35,950,384 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/2-Pre-Authorizations Pending-iCS/Jayco/40640/RO# 40640 media.zip
RO# 40640 media.zip
zip • Jun 18, 2026, 9:59 AM • 35,950,384 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/1- Pre-Authorizations Needed- iCS/Jayco/40640_1/RO# 40640 media.zip
40640.pdf
main-pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/LIN 1025/7- Claims in Process/7.1- Claims Submitted- iCS/Jayco/40640/40640.pdf
40640.pdf
main-pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/LIN 1025/7- Claims in Process/7.2- Claims Returned iCS-LIN/Jayco/40640/40640.pdf
40640.pdf
main-pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/6- Ready to Submit/Jayco/40640/40640.pdf
40640.pdf
main-pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/LIN 1025/6- Ready to Submit/Jayco/40640/40640.pdf
40640.pdf
main-pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/5-Pre-Authorizations Approved- LIN/Jayco/40640/40640.pdf
40640.pdf
main-pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/LIN 1025/5-Pre-Authorizations Approved- LIN/Jayco/40640/40640.pdf
40640.pdf
main-pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/2-Pre-Authorizations Pending-iCS/Jayco/40640/40640.pdf
40640.pdf
main-pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/LIN 1025/2-Pre-Authorizations Pending-iCS/Jayco/40640/40640.pdf
40640.pdf
main-pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/1- Pre-Authorizations Needed- iCS/Jayco/40640_1/40640.pdf
40640.pdf
main-pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/LIN 1025/1- Pre-Authorizations Needed- iCS/Jayco/40640/40640.pdf
1781791089579_40640_INVOICE_ACCOUNTING_1_original.pdf
pdf • Jun 18, 2026, 9:58 AM • 401,108 bytes
/home/openclaw/nas/Dropbox/#recycle/LIN 1025/1- Pre-Authorizations Needed- iCS/Jayco/40640/1781791089579_40640_INVOICE_ACCOUNTING_1_original.pdf