iClaims logo
Internal operations platform

Claim Detail

Search result → immediate full claim view.
Home
Claim explorer / evidence thread
Claim 10616
GRE 8220 • Alix • Write Off • forest-river
Next Recommended Action

Escalate to State

Payment deadline violated
Reason
OEM Response Deadline Exceeded
Deadline
Payment deadline violated
Estimated recovery
Pending payment match
risk 0.00 deadline Overdue / escalation ready images 0 matched 0

Warranty deadline timeline

Track where the claim sits in the recovery workflow, how many days have elapsed, and whether the auto-approval window or payment deadline is already in play.
Uploaded
Completed stage
178d elapsed • 0d remaining
Analyzed
Completed stage
178d elapsed • 0d remaining
Awaiting OEM
Completed stage
178d elapsed • 0d remaining
Auto-Approved
Completed stage
178d elapsed • 0d remaining
Payment Due
Completed stage
178d elapsed • 0d remaining
Escalation Eligible
Overdue / escalation ready
178d elapsed • 0d remaining • Overdue
Resolved
Upcoming statutory deadline
178d elapsed • 0d remaining

AI Claim Analysis

Estimated Recovery Amount
Pending payment match
What this claim may still be worth based on current evidence.
Compliance Score
100/100
Higher is cleaner. Lower means more missing support, more friction, or more OEM pushback.
Violations Detected
2
OEM Response Deadline Exceeded • Payment Deadline Exceeded
Missing Items
0
No active evidence gaps are listed.
Deadline Status
Overdue / escalation ready
178 days open in the visible workflow.
Recommended Action
Escalate to State
This is the fastest next move from the current workflow stage.

Dossier completeness

Files 2 • RO lines 0 • human-described photos 0 • 3C red • reconciliation unknown • linked side comments 2
Gaps: no parsed ro lines • no human level images • no human level image description • three c not quality ready • no reconciliation state • sidebar comment coherence not supported

US dispute readiness

Evidence packet check

Compact packet candidate
Operational preflight for US warranty escalation: packet size, chronology, cross-references, witness checks, source grounding, and backup evidence.
Estimated pack size
4
Proxy count from docs, images, comments, and claim lines. Actual PDF pages still need final preflight.
Evidence packet lane
Compact packet candidate
Small enough for a compact escalation packet, assuming final PDFs stay clean.
Chronology
Ready to order
Visible span: May 7, 2026, 5:05 AM to Jun 24, 2026, 3:05 PM.
Indexed evidence
1 docs / 1 images
Use only the strongest evidence in the escalation packet; keep the rest as support material.
Cross-reference base
Available
Line items, comments, or gap flags can be tied back to supporting material.
Witness verification
Human verification required
Any statement or affidavit output must be checked by the witness before use.
AI / citation gate
Manual check required
Escalation material must keep facts, inferences, citations, and source documents separated.
Expert evidence pressure
Not signalled
No expert-evidence trigger is visible from the current image rollup.
Escalation posture
Escalation watch
178 days open in the visible workflow; risk score 0.00.

Claim Summary

Evidence summary
No evidence summary yet.
Path
/home/openclaw/nas/Dropbox/GRE 8220/Write Off/10616/WO_10616_JOB_2_2024.06.06_15.24.21.jpg
Timeline
First seen May 7, 2026, 5:05 AM • last seen Jun 24, 2026, 3:05 PM
Evidence flags
No active evidence gap flags

Comment Intelligence

Thread depth
6 indexed side comments on this claim.
Latest visible thread signal
Oct 20, 2026, 4:53 PM • processor • TESTING AND LEARNING — Testing/Learning correction for RO 10616: My earlier review assigned the $35.65 labor to the wrong job. The original RO lists 0.31 hour at $115 under JOB 1, the WATER HEATER. JOB 2, the PUMP, has z
Role mix
Dealer 0 • OEM 0 • Processor 6
Decision cues
Denial signals 3 • info / missing-doc asks 3 • approval signals 0
Best move
Work missing-doc or reply asks first from the thread.

Quick Actions

Back to search results
Run the same search again.
Open focused evidence thread
Jump straight into Dropbox side comments, notes, and support documents.
Open claim explorer
Return to the main recovery queue view.
Open evidence room
See the quick-rule cards first, then open the legal basis only if needed.

Claim Lines

No claim lines loaded

Evidence Thread

Crystal Kemmerlin
processor • Jun 6, 2024, 8:57 PM
@ANNA F per FR The Warranty Period on this unit has expired.
Crystal Kemmerlin
processor • Jun 7, 2024, 10:58 AM
@ANNA F per FR The Warranty Period on this unit has expired.
Crystal Kemmerlin
processor • Jun 7, 2024, 11:01 AM
PA 1944680 submitted.
Alix Mongiat
processor • Jun 7, 2024, 1:31 PM
This has been denied as the water heater is out of warranty since 2020.
iClaims AI
processor • Oct 20, 2026, 1:05 PM
TESTING AND LEARNING — GRE 8220 / Write Off / WO 10616, 2017 Forest River Flagstaff E-Pro 19FD. ORIGINAL REASON: The June 7, 2024 Dropbox discussion reports the WATER HEATER claim denied because that unit's warranty had expired in 2020. The two-page June 6 RO records two DIFFERENT service jobs: (1) water heater inoperative on gas/electric; technician replaced a blown gas-side fuse, reset the 110V side and left it running for further testing, but charged $0.00 and did not document final heat/function tests; (2) water pump not priming; the photo shows a Shurflo Revolution model 4008-101-A65 built Dec 20, 2016, but the RO has only 0.31 hour labor at $115 = $35.65, with the listed $145.68 pump at QUANTITY ZERO. No installed replacement or successful pressure/prime test is established. Crucially, the native denial only mentions the WATER HEATER; it does not establish an OEM or supplier denial or unpaid amount for the PUMP. WHAT SHOULD HAVE BEEN DONE: check each component's actual OEM/component-manufacturer warranty and original in-service/coverage dates before submitting; diagnose heater gas/electric systems separately and verify hot water after resetting; record pump supply/air-lock, voltage, pressure and prime tests, identify actual installed parts, and route a qualifying independent Shurflo component claim only if warranty evidence supports it. RECONCILIATION: $35.65 labor is the entire warranty-coded RO total, NOT a verified denial/write-off or collectible recovery; the unbilled $145.68 pump is NOT money left on the table. Wisconsin Act 164 §218.164 took effect Oct 1, 2024, after this June 2024 work, and is not presumed retroactive; check the operative 2024 contract and component warranty. LEARNING: every billable line needs its own coverage decision, pre/post diagnostic proof, payer and remittance trail. Internal TESTING AND LEARNING only; money currently recoverable is UNDETERMINED. @Chris B @Heidi H @Tricia H
iClaims AI
processor • Oct 20, 2026, 4:53 PM
TESTING AND LEARNING — Testing/Learning correction for RO 10616: My earlier review assigned the $35.65 labor to the wrong job. The original RO lists 0.31 hour at $115 under JOB 1, the WATER HEATER. JOB 2, the PUMP, has zero labor and quantity zero for the listed $145.68 part. The heater was not a zero-dollar line. The technician replaced a blown fuse, reset the heater, observed gas ignition and measured 110 volts at the element; the record does not say the electric side was reset or confirm the final hot-water test. Why unpaid/written off: the owner confirms that status, and the June 7, 2024 sidebar says the heater was denied because its warranty had expired in 2020. No separate pump denial is documented. What could have been done differently: verify the original component coverage before charging work to manufacturer warranty, obtain any written goodwill or other applicable coverage approval, and document completed heater function tests and pump diagnosis separately. The pump photo identifies a Shurflo 4008-101-A65 built December 20, 2016; the 2024 purchase of this used unit does not by itself establish new component coverage. Lesson: map each labor charge to its actual job and secure the coverage decision before submission. $35.65 is the heater charge shown, not a demonstrated present recovery amount. @Chris B @Heidi H @Tricia H

Claim Files

WOOD.pdf
main-pdf • Jun 6, 2024, 4:42 PM • 72,788 bytes
/home/openclaw/nas/Dropbox/GRE 8220/Write Off/10616/WOOD.pdf